Skip to main content

Building india's new Hyderabad-Bangalore motorway

The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions. It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.
April 13, 2012 Read time: 2 mins
MB crusher buckets are working on the new Hyberrabad-Bangalore motorway
The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions.

It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.

Italian company 283 MB is supplying crusher buckets to help build the motorway: the BF120.4 bucket will be used to produce the stabilised pavements every 50km.

According to MB a feature of the BF120.4 is that it is the only piece of equipment capable of reducing the size of crushed granite from 20cm to 4cm, thus "making the job easier and more versatile." The Breganze-based company (currently in the process of obtaining the ISO 14001 certification) says that its buckets work using the hydraulic system of the excavator they are fitted to, and, "unlike traditional crushers, offer significantly reduced transportation and waste disposal costs, thus allowing inert materials to be recycled." Guido Azzolin, managing director of MB, said: "We are extremely optimistic on the successful outcome of the motorway that will connect the cities of Hyderabad and Bangalore, both extremely excited to try out our highly technological, Italian-made buckets and to obtain a new communication line that we are sure will be appreciated by the Indian country."

For more information on companies in this article

Related Content

  • Road recycling developments coming to market
    March 22, 2017
    Major manufacturers are introducing new machines for road milling and recycling that will boost output and lower the cost/m - Mike Woof writes New machines for milling and road recycling will offer increased performance and productivity than earlier generation equipment. Higher quality cutting will help contractors achieve smoother surfaces and considerably lower paving costs also. Meanwhile new recycler/stabiliser machines will offer a better cost/m and improve the economics of road recycling for contra
  • Beyond business as usual: Addressing the energy and carbon performance of our road infrastructure
    October 5, 2021
    Following recent policy-setting decisions by authorities in Europe and North America to achieve net zero emissions economy-wide no later than 2050, IRF has invited contributions from notable industry innovators in preparation for the 18th IRF World Meeting & Exhibition. Jonathan Davis, co-founder and CCO at Uberbinder, shares his thoughts on the historic responsibility and opportunity for the road industry to enhance its energy and carbon performance
  • Simex: Road Maintenance
    October 26, 2023
    In the world of road maintenance and paving, as well as construction, the issue of recovering material deriving from demolition and scarification is becoming increasingly urgent, with the dual objective of combining environmental protection with economic savings. Those who work in the sector are well aware of the huge costs of transporting and disposing of asphalt and material from demolition, as well as the costs for the purchase and transport of new raw materials to the site. Now, as never before, the sector features its own circular economy, particularly in regards to bituminous conglomerates: road paving can be recycled several times, in full compliance with the regulations in force.
  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.