Skip to main content

Building india's new Hyderabad-Bangalore motorway

The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions. It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.
April 13, 2012 Read time: 2 mins
MB crusher buckets are working on the new Hyberrabad-Bangalore motorway
The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions.

It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.

Italian company 283 MB is supplying crusher buckets to help build the motorway: the BF120.4 bucket will be used to produce the stabilised pavements every 50km.

According to MB a feature of the BF120.4 is that it is the only piece of equipment capable of reducing the size of crushed granite from 20cm to 4cm, thus "making the job easier and more versatile." The Breganze-based company (currently in the process of obtaining the ISO 14001 certification) says that its buckets work using the hydraulic system of the excavator they are fitted to, and, "unlike traditional crushers, offer significantly reduced transportation and waste disposal costs, thus allowing inert materials to be recycled." Guido Azzolin, managing director of MB, said: "We are extremely optimistic on the successful outcome of the motorway that will connect the cities of Hyderabad and Bangalore, both extremely excited to try out our highly technological, Italian-made buckets and to obtain a new communication line that we are sure will be appreciated by the Indian country."

For more information on companies in this article

Related Content

  • Terex Finlay unveils new I-140 impact crusher
    January 6, 2017
    Terex Finlay’s new I-140 direct drive ø1,270mm x 1,240mm horizontal impact crusher offers variable speed for production in recycling, mining and quarrying applications. A significant engineering approach being introduced in this model is the material flow through the plant. The flow of material has been significantly improved by increasing the width of components as the material moves through the machine, says Terex Finlay. The I-140’s robust and proven Terex CR032 chamber is said to give excellent
  • Environmental impact drives warm mix growth
    November 14, 2012
    Warm mix asphalt can save energy and the environment, cutting emissions of carbon dioxide and other harmful gases, but are environmental arguments enough for clients and contractors? Kristina Smith asks Though popular in the United States, warm mix asphalt is still a technology waiting to happen in the rest of the world. Chemical companies who imagined a meteoric rise in sales are still waiting for the right economic conditions to allow warm mix to start taking serious market share from hot mix. “In Europe
  • Rome airport taxiway rebuild work
    May 5, 2020
    Rome airport taxiway has benefited from rebuilding work.
  • Major highway growth in Portugal
    February 14, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved