Skip to main content

Astec developing European facility

Astec Industries is setting up Astec Mobile Machinery, which will be based at Hameln in Germany. The new facility will help the firm's international growth, particularly in Eastern Europe and Russia where the firm already has a strong sales presence and where road construction is strong at present.
May 2, 2012 Read time: 2 mins
681 Astec Industries is setting up Astec Mobile Machinery, which will be based at Hameln in Germany. The new facility will help the firm’s international growth, particularly in Eastern Europe and Russia where the firm already has a strong sales presence and where road construction is strong at present.

The manufacturing and office space is in Hameln, close to Hanover in Lower Saxony. The operation is being staffed by German engineers, service technicians, and sales staff and will serve all of Europe.

1252 Roadtec, part of Astec Industries, will be taking the lead in developing the facility. However the plans call for the location to serve as a European hub for most Astec Industries companies in the future. Roadtec core products are asphalt finishers, cold planers, Shuttle Buggy material transfer devices, soil stabilisers, cold-in-place recycling equipment and self-propelled brooms used in road construction. Among the projects in the works already at Hameln is the development of a tamper bar screed, which will be manufactured at Astec Mobile Machinery Europe from the quarter of 2012. This screed technology will allow Roadtec to begin marketing its pavers in Europe and in other international territories. The facility will stock parts and provide service to the growing Astec Industries European customer base and will be headed by Michael Pottkaemper.

For more information on companies in this article

Related Content

  • Liebherr continues to grow despite tough trading conditions
    January 6, 2017
    Liebherr is weathering the current financial situation rather better than some other firms, having seen turnover increase 9.8% to €4.4 billion in the first half of 2012, compared with the previous year. According to Andreas Boehm, a member of the board of directors at Liebherr, turnover for the mining and construction operations saw gains of 7.7% to €2.84 billion in the first half of 2012, compared with 2011. He continued, “Turnover from our earthmoving machinery increased 14.4% to €1.07 billion.” However,
  • Liebherr continues to grow despite tough trading conditions
    November 28, 2012
    Liebherr is weathering the current financial situation rather better than some other firms, having seen turnover increase 9.8% to €4.4 billion in the first half of 2012, compared with the previous year. According to Andreas Boehm, a member of the board of directors at Liebherr, turnover for the mining and construction operations saw gains of 7.7% to €2.84 billion in the first half of 2012, compared with 2011. He continued, “Turnover from our earthmoving machinery increased 14.4% to €1.07 billion.” However,
  • Cost-effective innovative backfill recycling
    February 29, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams which
  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams