Skip to main content

Asphalt plant component purchase for Brock

Ben Brock has purchased an asphalt plant component business.
By MJ Woof July 23, 2020 Read time: 1 min
Ben Brock purchased asphalt component business JBK Enterprises and has renamed the firm BROCK

Ben Brock, former president and CEO of Astec Industries, has acquired substantially all of the assets of JBK Enterprises. Brock is now the president and CEO of the company, which has been renamed BROCK following the acquisition. FourBridges Capital Advisors acted as exclusive financial advisor to Brock, while Baker Donelson provided legal counsel for the deal.

Previously owned by Lori Stafford, JBK was founded in 1990 as a manufacturer and after-market parts supplier for asphalt plant owners. JBK’s office and manufacturing facility are located in Georgetown, Tennessee.

Brock served in various roles with Astec from 1993 until 2019, when he left the company after serving as president and CEO for over five years. “I’m very excited to be back in the asphalt industry with this acquisition. I’m also excited about our team —successful industry veterans who have all worked together over the years,” Brock said.

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Astec’s Azerbaijan asphalt application
    June 9, 2015
    In Azerbaijan an Astec batching plant is said to be giving a major contractor an advantage over its competition The firm, Aztikintiyol, is one of the leading producers of aggregates and hot-mix asphalt in Azerbaijan and decided to expand its operations into the southern regions of the country. The need for asphalt in this area was growing as there is massive infrastructure development close to the border with neighbouring Iran taking place. However a simple plant was not suitable as the firm required
  • Construction equipment market to grow - CEA report
    February 29, 2012
    The UK’s Construction Equipment Association attracted a large audience for its annual general meeting.