Skip to main content

Asphalt Institute Foundation – research request for new specifications

The Asphalt Institute Foundation (AIF) has released Request for Proposals (RFP) for research into asphalt durability. These next-generation specifications are intended to boost asphalt performance and sustainability. The RFPs are being funded through the AIF research committee. The research areas originated from discussions held at the inaugural AIF-sponsored Strategic Asphalt Research (STAR) symposium. The RFPs are available on the Asphalt Institute Foundation’s website at asphaltfoundation.org. The deadl
August 16, 2019 Read time: 1 min

The Asphalt Institute Foundation (AIF) has released Request for Proposals (RFP) for research into asphalt durability. These next-generation specifications are intended to boost asphalt performance and sustainability.

The RFPs are being funded through the AIF research committee. The research areas originated from discussions held at the inaugural AIF-sponsored Strategic Asphalt Research (STAR) symposium. The RFPs are available on the Asphalt Institute Foundation’s website at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external asphaltfoundation.org false https://www.asphaltfoundation.org/ false false%>. The deadline for submission is September 27th, 2019.

The Asphalt Institute Foundation supports strategic research projects that are designed to advance and improve both the liquid asphalt industry and the welfare of the general public. Established in 2014, the Asphalt Institute Foundation is a 501(c)3 non-profit organisation.

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Improved performance from Nikon-Trimble’s latest total stations
    January 6, 2017
    Nikon-Trimble says that its latest Nikon NPL-322 Series of mechanical total stations offer more precise accuracy and performance. The range includes instruments with angular accuracy of 50.8mm and 127mm, with the former featuring dual-displays for productive angle measurement. Both NPL-322 total station models feature a reflectorless EDM with a range of 200m. High reliability is claimed and thee NPL-322 Series adds reflectorless measurement capabilities to the firm’s field-proven Nikon DTM-322 product line,
  • Improved performance from Nikon-Trimble’s latest total stations
    February 11, 2013
    Nikon-Trimble says that its latest Nikon NPL-322 Series of mechanical total stations offer more precise accuracy and performance. The range includes instruments with angular accuracy of 50.8mm and 127mm, with the former featuring dual-displays for productive angle measurement. Both NPL-322 total station models feature a reflectorless EDM with a range of 200m. High reliability is claimed and thee NPL-322 Series adds reflectorless measurement capabilities to the firm’s field-proven Nikon DTM-322 product line,