Skip to main content

ARRA’s Asphalt Recycling/Reclaiming Award Nominations

The nomination closing date is fast approaching for 2017 Asphalt Recycling/Reclaiming Award so don’t delay. Nominate Your Project Today!
November 25, 2016 Read time: 1 min

The nomination closing date is fast approaching for 2017 Asphalt Recycling/Reclaiming Award so don’t delay. Nominate Your Project Today!

The Asphalt Recycling/Reclaiming Award are organised by the US-based 8542 Asphalt Recycling & Reclaiming Association (ARRA) and Roads & Bridges magazine.

The Roads & Bridges/ARRA Recycling Awards honour the top asphalt road recycling projects in North America.

Nominations are submitted to the R&B editorial staff, which, along with the ARRA’s executive committee, selects the winners based on amount of RAP used, cost savings and project challenges. Upon completion of the review process, top projects in the following categories will be determined:

  • Hot In-Place Recycling;
  • Cold In-Place Recycling;
  • Cold Planing; and
  • Full-Depth Reclamation


To qualify, projects must have been in the design or construction phase over the past 18 months. Past winners are not eligible.

(Please note that these awards are separate and distinct from ARRA's Annual Excellence in Recycling Awards for public agencies and consulting engineers.)

Don’t wait…NOMINATE! And make sure to include information about the project’s challenges.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal https://www.roadsbridges.com/recycling-nomination Visit Roads bridges website false http://www.roadsbridges.com/recycling-nomination false false%>

For more information on companies in this article

Related Content

  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    June 26, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region. At its first ERF biennial Symposium on Road Infrastructure Challenges in June, more than 100 stakeholders heard the ERF demand the “ope
  • New highly mobile asphalt mixing plant from Ammann
    January 6, 2017
    Ammann’s Prime 140 is the latest addition to the company’s successful continuous asphalt mixing plants. Highly mobile and compact, the Prime 140 produces high-quality asphalt thanks to the clear separation of the drying and mixing processes. Reclaimed asphalt and fibres can be added far away from the heat source.
  • New highly mobile asphalt mixing plant from Ammann
    April 18, 2013
    Ammann’s Prime 140 is the latest addition to the company’s successful continuous asphalt mixing plants. Highly mobile and compact, the Prime 140 produces high-quality asphalt thanks to the clear separation of the drying and mixing processes. Reclaimed asphalt and fibres can be added far away from the heat source.
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.