Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • Earthmoving developments for construction machines
    August 14, 2017
    Excavators, wheeled loaders and ADTs have all seen improvements for this year. New developments in earthmoving machines continue to help improve working efficiency for contractors. The excavator market is the largest single segment of the construction machine sector, with competition being tough between the major players, and a steady stream of new models coming to market. Doosan has launched the new Stage IV compliant DX225LC-5 crawler excavator, which is said to offer high performance, fuel efficiency, r
  • Achieving a smooth road surface
    September 28, 2015
    Achieving a smooth road surface has helped a US contractor gain a bonus payment of US$605,000 on a paving job in Montana. A recently renovated 16km section of I-90, starting in Alberton, Mont., which is located on the Western part of the state near the Idaho border, and stretching East, received sterling commendations, beat target IRI scores, and earned the general contractor quality bonuses. The project also won the 2014 MCA Excellence Award for Best Paving Smoothness from the Montana Contractors Associat
  • It’s Miller time for Doosan excavators and loaders in Scotland
    April 17, 2018
    Scottish Doosan dealer Balgownie has supplied new Doosan DX225LC-5 22tonne and DX255LC-5 25tonne excavators and a new DL420-5 wheeled loader to Miller Plant. Miller Plant offers services from bulk earthworks and contract crushing and screening to plant hire, site clearance, demolition, aggregate supply and heavy haulage and tipper hire. As the machines will do more than 60 hours a week each, they come with a peace-of-mind five-year warranty and Balgownie’s fast response to requests and service support.
  • Race track construction in Japan
    March 13, 2024

    Road construction machines from the Wirtgen Group have been used to build a new race track in Japan. Four Vögele asphalt pavers worked on the project to build a demanding circuit in a mountainous area in Japan.

    Tight corners and uphill gradients of up to 19% are features of the private racing circuit. Three Vögele pavers, a SUPER 1800-3i, a SUPER 1803-3i and a SUPER 1900-2, paved almost 100,000m2 in four layers, while a MT 3000-3i offset material feeder was also used to ensure efficiency and quality.