Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • New Benninghoven Batchmix 1250 built for quick transport and installation
    April 23, 2015
    Easy transportation and installation are key benefits of the new Benninghoven Batchmix 1250. “It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.
  • E-Mak has developed a new asphalt plant for recycled materials
    January 6, 2017
    Turkish asphalt plant specialist E-Mak is supplying an innovative recycling system to a firm in Hamburg. The machine is a prototype and is still being developed, with indirect heating to ensure that the bitumen is not damaged during the recycling process. The machine uses heat generated by the burner and flows this hot air through the tower. The RAP elevator carries the material to a bin with a special valve underneath that then controls the feed quantity. Specially designed flights inside the tower increas
  • E-Mak has developed a new asphalt plant for recycled materials
    April 19, 2013
    Turkish asphalt plant specialist E-Mak is supplying an innovative recycling system to a firm in Hamburg. The machine is a prototype and is still being developed, with indirect heating to ensure that the bitumen is not damaged during the recycling process. The machine uses heat generated by the burner and flows this hot air through the tower. The RAP elevator carries the material to a bin with a special valve underneath that then controls the feed quantity. Specially designed flights inside the tower increas
  • Hydrogen burners for asphalt plants
    September 3, 2024
    Key manufacturers in the asphalt plant market, Ammann, Benninghoven and Marini, are developing systems able to use alternative fuels to reduce CO2 emissions.