Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • More efficient asphalt output from new plants
    November 20, 2015
    Advances in asphalt plant design offer major gains in product throughput and quality, while also allowing for warm asphalt and increased recycling The asphalt sector is constantly looking for ways to optimise production, lower costs and improve product quality and consistency. Competition is fierce in the asphalt plant market, with several of the key companies working hard to develop new and more efficient technologies, as well as equipment that is more versatile and more mobile. Advances have been made
  • Innovative asphalt production solutions from Marini
    May 24, 2019
    Marini has developed an innovative solution for asphalt production, able to use up to 100% RAP in the mix - Mike Woof writes Italian firm Marini has long been one of the leaders in the field of asphalt plant design and development, competing against other key companies in the segment based in the US, Switzerland and Germany. Marini is expanding its range, with what it claims will be a revolutionary system for using recycled asphalt pavement (RAP) in asphalt mixes, as well as further additions to its mobi
  • Asphalt plants looking at greener production systems
    April 10, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports. Lintec, in partnership with Loesche, recently created what they say is the world’s first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal.
  • Asphalt plants looking at greener production systems
    April 11, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports Lintec, in partnership with Loesche, recently created what they say is the world's first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal. The mobile co