Skip to main content

Special mixes produced for a race track in Indonesia

International motorcycle racing has returned to Indonesia with help from asphalt plants supplied by Lintec & Linnhoff after a 24-year hiatus
March 4, 2022 Read time: 4 mins
High-quality mixes were supplied by the plant for the track surface

A Lintec CSD3000 containerised asphalt plant, the largest mixing plant in the country, has been key to producing its new, premium-quality racetrack in record time in Indonesia. Two Linnhoff TSD1500 MobileMix asphalt plants were also used to produce the asphalt mix for the run-off areas.

The Lintec CSD3000 asphalt plant supplied more than 50,000tonnes of hot mix asphalt from the highest quality materials for the high-profile project. The premium stone mastic asphalt (SMA) material is used for the surface layer of the new track on Lombok Island, making the circuit one of the few to adopt this harder-wearing technology.

The construction work on the 4.31km Pertamina Mandalika International Street Circuit on Lombok Island’s southern coast began in June 2020, as part of the Indonesian government’s campaign to promote international tourism. Paving works began in February 2021 and continued until August 2021, with the entire project being completed by October 2021. The circuit was ready to host its first race, the finale of the FIM Superbike World Championship (WorldSBK) season, during November 19th-21st 2021.

The motorcycle racers took advantage of the high-quality track surface and the final round of the 2021 World Superbike Championship was notable, with Toprak Razgatlioglu becoming the first ever Turkish WorldSBK champion.

As the resort area of Mandalika continues its transformation into a tourist area rivalling nearby Bali, the track has become the only street circuit in the prestigious MotoGP calendar used as an ordinary road when no events are scheduled.

The surface layer is paved using the SMA mixture, which combines the tough coarse aggregate Tau stone from Palu, Central Sulawesi, with performance grade (PG) 82 polymer-modified bitumen (PMB). Also added was limestone filler from Ponorogo and Probolinggo, East Java, and cellulose fibre additives from Germany. Only premium quality materials were used for the asphalt mixes. By strengthening the structure of the surface layer so that it remains strong through stone-by-stone contact, the high cohesive strength provides greater resistance to intense heat and heavy loads. By remaining non-slippery in wet conditions, this mix is highly suitable for racetracks in tropical regions.

The plant was used to produce mixes with very specialised recipes to best suit the application
The plant was used to produce mixes with very specialised recipes to best suit the application

With its effective screening, accurate weighing, proper and efficient drying, and a production output of up to 240tonnes/hour, the Lintec CSD3000 plant proved valuable for the project. The high capacity asphalt plant was chosen to minimise the paving joints for a smoother racetrack surface. With the PG 82 PMB providing improved workability of asphalt mixtures, it was crucial that the contractors used a plant that could provide homogeneous output to ensure a reliable, optimum mix.

The plant produced over 50,000tonnes of hot mix asphalt for the three layers of the main track; namely the asphalt concrete (AC) base layer; AC binder layer; and the SMA surface layer.

Lintec & Linnhoff said that the contractors appreciated the consistent quality of the finished mix. In addition, the novel double screen drum technology allowed energy savings as there is no hot elevator or vibrating screens, while also boosting higher reliability and requiring less maintenance.

The Lintec CSD3000’s modular construction means that the plant is built inside ISO shipping containers for safe, economical transportation, which cut installation and commissioning times after the equipment was delivered to the jobsite.

The Lintec CSD3000 was joined onsite by two Linnhoff TSD1500 MobileMix asphalt plants. These mid-size models of the range produced 90-100tonnes of hot mix asphalt/hour, and were primarily used to produce material for the run-off areas around the main track.

These areas also play host to a large paddock area containing 40 garages, along with temporary grandstand seating for 50,000 fans and 7,700-person capacity hospitality suites, all of which will be removed at the end of each race. There is also a standing area catering for 138,000 spectators.

Operated by the Mandalika Grand Prix Association (MGPA), the generally flat circuit features 17 turns, with just a few hard braking areas.

The circuit has met the Fédération Internationale de Motocyclisme (FIM) Class A level and will play host to the prestigious MotoGP in March 2022. The operator is also aiming to meet the Fédération Internationale de l’Automobile (FIA) Grade 1 level to be eligible as a potential future Formula 1 venue.

For more information on companies in this article

Related Content

  • Benninghoven | Reducing the carbon footprint in asphalt production
    May 5, 2023
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.
  • New racetrack benefits from new technology
    December 3, 2014
    The use of new technology has helped pave the way for a new US racetrack Saving construction costs and meeting tight tolerances, sophisticated technology has helped deliver a quality racetrack surface within tight time constraints. The National Corvette Museum (NCM) in Bowling Green, Kentucky, lies close to Interstate 65 and now features a brand new racetrack, constructed with the assistance of the latest machine control technologies.
  • Lintec developing novel asphalt plant solutions
    March 16, 2016
    Highly innovative, LINTEC’s new LEP 95 system is a new, patented warm mix asphalt solution. This can be configured to produce both hot and warm mix asphalt depending on demand at the job site. A major reduction in energy consumption and emissions can be achieved by the LINTEC system working in a temperature range of 95°C-100°C. This unitcan be fitted to new or existing plants and is said to produce a smooth and stable foam for an optimum mixing result at low temperatures, while it is reliable and has low ma
  • Multitask additive B2last® for road pavement from BASF
    September 1, 2023
    In 2020, BASF launched their brand-new additive for warm mix asphalt, B2Last®, a new liquid modifier in both Europe and in the USA. By chemically modifying the asphalt binder, BASF developed an innovative solution for the paving industry. After nearly four years of field usage and trials in different regions, B2Last has proven to be an efficient and cost-effective way to modify bitumen.