Skip to main content

Scalping solution from Sandvik

The first new mobile screen to be launched under the Sandvik name, rather than the Fintec or Extec brands, is the heavy duty tracked QE440 scalping screen. The QE440 was displayed in a live demonstration at a customer event in the UK this summer to launch the newly unified branding and new machine colours. During the demonstration, customers had a chance to view other mobile crushing and screening units in the Sandvik range, as well as the new BR2577 hydraulic breaker.
July 16, 2012 Read time: 2 mins
The first new mobile screen to be launched under the 325 Sandvik name, rather than the Fintec or Extec brands, is the heavy duty tracked QE440 scalping screen.

The QE440 was displayed in a live demonstration at a customer event in the UK this summer to launch the newly unified branding and new machine colours. During the demonstration, customers had a chance to view other mobile crushing and screening units in the Sandvik range, as well as the new BR2577 hydraulic breaker.

According to Sandvik sales manager Michael Brookshaw, the new screen is designed for quarries that need larger capacity for screening close to the production face. "It is also ideal for mining and recycling applications," he said. "The screen has the capability to rapidly sort a large range of feed sizes."

The unit has a 600tonnes per hour capacity with an 8m³ hopper, a 5.5 by 1.8m screen deck and a recirculating conveyor. The QE440 has been designed to have 40% more screening area than the previous range topping QE340.
The new model has also been designed with wider and higher stockpiling conveyors to match the increased production capacity with larger stockpiling capabilities. To improve the ability of the QE440, the screen has been mounted on a mobile crusher type chassis to ensure its heavy duty credentials.

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Asphalt plant operators offer fuel for thought
    August 28, 2013
    Asphalt plant operators across continental Europe are said to be increasingly turning to pulverized lignite to fuel or partially fuel production, while leading plant manufacturers have been busy closing key deals with customers in Russia, Bangladesh and Switzerland. Guy Woodford reports. Financially astute asphalt plant operators in Europe are said to be increasingly using pulverized lignite, also known as brown coal, from Germany to fuel or partially fuel production. Under the product name ‘Lignite Energ
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de
  • Powering up with new engines
    October 11, 2021
    John Deere Power Systems is offering advanced new power solutions for its customers