Skip to main content

Scalping solution from Sandvik

The first new mobile screen to be launched under the Sandvik name, rather than the Fintec or Extec brands, is the heavy duty tracked QE440 scalping screen. The QE440 was displayed in a live demonstration at a customer event in the UK this summer to launch the newly unified branding and new machine colours. During the demonstration, customers had a chance to view other mobile crushing and screening units in the Sandvik range, as well as the new BR2577 hydraulic breaker.
July 16, 2012 Read time: 2 mins
The first new mobile screen to be launched under the 325 Sandvik name, rather than the Fintec or Extec brands, is the heavy duty tracked QE440 scalping screen.

The QE440 was displayed in a live demonstration at a customer event in the UK this summer to launch the newly unified branding and new machine colours. During the demonstration, customers had a chance to view other mobile crushing and screening units in the Sandvik range, as well as the new BR2577 hydraulic breaker.

According to Sandvik sales manager Michael Brookshaw, the new screen is designed for quarries that need larger capacity for screening close to the production face. "It is also ideal for mining and recycling applications," he said. "The screen has the capability to rapidly sort a large range of feed sizes."

The unit has a 600tonnes per hour capacity with an 8m³ hopper, a 5.5 by 1.8m screen deck and a recirculating conveyor. The QE440 has been designed to have 40% more screening area than the previous range topping QE340.
The new model has also been designed with wider and higher stockpiling conveyors to match the increased production capacity with larger stockpiling capabilities. To improve the ability of the QE440, the screen has been mounted on a mobile crusher type chassis to ensure its heavy duty credentials.

For more information on companies in this article

Related Content

  • Hydraulic breakers key to Hyderabad road project
    April 10, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
  • Hydraulic breakers key to Hyderabad road project
    May 8, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
  • Hitachi’s excavator digs deep in the Swiss Jura
    May 1, 2015
    A new Hitachi ZX870LCR-5 owned by Swiss company Lachat is making a significant impact on the production process at the Asuel La Malcôte quarry in the canton of Jura. The large Zaxis-5 excavator is excavating a mixture of marlstone and limestone materials in a much cleaner way than before, as well as helping to sanitise the relatively unstable site. Lachat, founded in 1948 and taken over by the Steiner Group in June 2013, has 42 employees working in quarrying, recycling and the production of aggregates
  • New soil compactor launches from key manufacturers
    May 30, 2013
    Major manufacturers continue to develop new soil compactor models - Mike Woof reports. Innovations in machine design are being seen in the soil compaction sector from a number of major firms. As in other equipment sectors, new engine emissions legislation has played a huge role in driving the latest design changes. Europe, the US and Japan are rolling in the new Tier 4 Final/Stage IV legislation on noise and exhaust emissions which will be phased in across power output classes from the start of January 2014