Skip to main content

Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project

The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
April 4, 2018 Read time: 4 mins
Sandvik’s Ranger DQ500 was on site and on drilling duty
The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong


There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems.

The US$3.2 billion control point will connect existing expressway systems in Hong Kong and Shenzhen to cut travel time between Hong Kong and eastern Guangdong, as well as southern Fujian and Jiangxi.

Contract 6 involves building a new highway, viaducts and a 700m road tunnel by the end of 2018 at a cost of around $770 million. The work is being done by a joint venture of China Road and Bridge Corp from mainland China, Taiwan’s Continental Engineering and Hong Kong-based Kaden Construction - the CRBC-CEC-Kaden JV.

“We needed surface drill rigs for open cut of the hills by drill and break. Tunneling jumbos for tunnel excavation and then high-quality mobile crushers to crush the excavated rock,” said K Y Chow, construction manager for the joint venture.

For drilling duty, a Ranger DQ500 and a Ranger DX700 were working on site but the joint venture also bought three Ranger DX800 surface drill rigs.

The drill rigs were used for the open cut of the hills by drill and break. Drill and blast was forbidden because blasting was not permitted on the type of hill cut along the highway.

The Ranger DX800, however, proved to be highly suited to the application. One of the new features is the revolving superstructure enabling large drilling coverage from the standard 17.6m² to a US standard 26.4m². When rotating, the rig’s stability is guaranteed because the counterweight remains always on the opposite side of the boom.

The rig also features a THC700 drilling control system that automatically adjusts to changing rock formations. It also sends an optimal amount of power to the rock to ensure smooth rotation, solid rock contact and fast penetration in different rock conditions.

Low fuel consumption is achieved by an ecopackage that includes engine RPM adjustment. Tramming force has been boosted by over 10%, according to 325 Sandvik.

For excavation of the dual two-lane tunnel, Sandvik supplied three DT1230i's and one DT820-SC tunneling jumbos. These were required because each tunnel is 14m wide and 11m high for two lines of traffic on the two main tunnels, along with some small cross passage tunnels. The Sandvik DT1230i is a computer-controlled three-boom electro-hydraulic drilling jumbo for tunneling and cavern excavation of 20 211m² cross sections, including face drilling, bolt hole drilling and mechanised long-hole drilling.

The DT1230i is coupled with the iSURETM tunnel management programme, intelligent iDATA control system, newly-launched high-frequency RD525 drills, robust booms and advanced drill string guides.

Sandvik QJ241 tracked jaw crushers have been crushing excavated granite for the tunnel’s road base. The QJ241 has handled the 600mm feed-size to produce a 250mm product. This is further fed into the second Sandvik QJ241 to produce a 40mm product for tunnel refilling.

The self-propelled QJ241 is Sandvik’s smallest compact tracked jaw crusher. It is fitted with a hydraulic raise-and-lower facility on the main conveyor making it ideal for hard rock applications.

A full service and maintenance agreement was signed between Sandvik and the CRBC-CEC-Kaden JV, as well as Sandvik providing all spare parts, lube and oil.

For more information on companies in this article

Related Content

  • Tunnel construction in Italy using breakers
    August 10, 2018
    Hydraulic breakers from Indeco have helped with the excavation of a road tunnel in Italy. The HP 7000 and HP 5000 units from Indeco were used for excavation of a stretch of tunnel where blasting could not be used due to the proximity of live traffic. The Greppoli Tunnel is located between Grosseto and Siena in the section of road near Civitella Paganico on the SGC E 78. The route connects the Tyrrhenia coast with the Adriatic and is a major highway, connecting Grosseto to Fano. The 100m-long Greppoli Tunne
  • Keestrack’s growing presence in China
    November 21, 2018
    Keestrack is introducing a comprehensive range of large tracked mobile machines to the Chinese market. These encompass all relevant screening and crushing technologies for quarrying, recycling and aggregates industry sectors. Four important new models are being unveiled. The B4 jaw crusher ensures less wear and better crushing capacities due to its double-deck vibrating pre-screen (2300 x 1000mm). The proven 1100 x 700mm jaw crusher (maximum feed size 600mm) reaches an hourly output up to 400tonnes and pro
  • Tunnelling option for XCMG
    May 30, 2018
    XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province. The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limes
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk