Skip to main content

Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project

The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
April 4, 2018 Read time: 4 mins
Sandvik’s Ranger DQ500 was on site and on drilling duty
The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong


There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems.

The US$3.2 billion control point will connect existing expressway systems in Hong Kong and Shenzhen to cut travel time between Hong Kong and eastern Guangdong, as well as southern Fujian and Jiangxi.

Contract 6 involves building a new highway, viaducts and a 700m road tunnel by the end of 2018 at a cost of around $770 million. The work is being done by a joint venture of China Road and Bridge Corp from mainland China, Taiwan’s Continental Engineering and Hong Kong-based Kaden Construction - the CRBC-CEC-Kaden JV.

“We needed surface drill rigs for open cut of the hills by drill and break. Tunneling jumbos for tunnel excavation and then high-quality mobile crushers to crush the excavated rock,” said K Y Chow, construction manager for the joint venture.

For drilling duty, a Ranger DQ500 and a Ranger DX700 were working on site but the joint venture also bought three Ranger DX800 surface drill rigs.

The drill rigs were used for the open cut of the hills by drill and break. Drill and blast was forbidden because blasting was not permitted on the type of hill cut along the highway.

The Ranger DX800, however, proved to be highly suited to the application. One of the new features is the revolving superstructure enabling large drilling coverage from the standard 17.6m² to a US standard 26.4m². When rotating, the rig’s stability is guaranteed because the counterweight remains always on the opposite side of the boom.

The rig also features a THC700 drilling control system that automatically adjusts to changing rock formations. It also sends an optimal amount of power to the rock to ensure smooth rotation, solid rock contact and fast penetration in different rock conditions.

Low fuel consumption is achieved by an ecopackage that includes engine RPM adjustment. Tramming force has been boosted by over 10%, according to 325 Sandvik.

For excavation of the dual two-lane tunnel, Sandvik supplied three DT1230i's and one DT820-SC tunneling jumbos. These were required because each tunnel is 14m wide and 11m high for two lines of traffic on the two main tunnels, along with some small cross passage tunnels. The Sandvik DT1230i is a computer-controlled three-boom electro-hydraulic drilling jumbo for tunneling and cavern excavation of 20 211m² cross sections, including face drilling, bolt hole drilling and mechanised long-hole drilling.

The DT1230i is coupled with the iSURETM tunnel management programme, intelligent iDATA control system, newly-launched high-frequency RD525 drills, robust booms and advanced drill string guides.

Sandvik QJ241 tracked jaw crushers have been crushing excavated granite for the tunnel’s road base. The QJ241 has handled the 600mm feed-size to produce a 250mm product. This is further fed into the second Sandvik QJ241 to produce a 40mm product for tunnel refilling.

The self-propelled QJ241 is Sandvik’s smallest compact tracked jaw crusher. It is fitted with a hydraulic raise-and-lower facility on the main conveyor making it ideal for hard rock applications.

A full service and maintenance agreement was signed between Sandvik and the CRBC-CEC-Kaden JV, as well as Sandvik providing all spare parts, lube and oil.

For more information on companies in this article

Related Content

  • Cost-effective tunnel waterproofing
    February 14, 2012
    The strong market for shotcreting technology has led BASF to hold a workshop for waterproofing specialists. The firm's latest system can be used to provide a permanent waterproof single-shell tunnel lining based on sprayed concrete and double-bonded waterproofing membrane.
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Northern Spire wins award from UK’s Association for Project Management
    November 30, 2018
    The Northern Spire bridge in Sunderland, northern England, has beaten off stiff competition to win another national construction and engineering award. The Spire, which opened in August this year at a cost of €132 million, was named Project of the Year: Engineering, Construction and Infrastructure 2018 by the UK’s Association for Project Management. The award is the latest honour for Sunderland’s 105m-tall cable-stayed bridge which links Castletown on the north side of the River Wear with Pallion.
  • A new road tunnel will improve connections in Finnish city Tampere
    July 18, 2012
    Plans are in hand in Finland’s second largest city Tampere for a new road tunnel to boost transport connections. An agreement has been made between a consortium headed by contractor Lemminkäinen, the City of Tampere and Finnish Transport Agency. The alliance agreement is for the first stage of the VT12 Tampere tunnel project, which is expcted to cost in the region of €185 million. The consortium comprises Lemminkäinen, A-Insinöörit Suunnittelu and Saanio & Riekkola. The project will be divided into developm