Skip to main content

Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project

The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
April 4, 2018 Read time: 4 mins
Sandvik’s Ranger DQ500 was on site and on drilling duty
The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong


There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems.

The US$3.2 billion control point will connect existing expressway systems in Hong Kong and Shenzhen to cut travel time between Hong Kong and eastern Guangdong, as well as southern Fujian and Jiangxi.

Contract 6 involves building a new highway, viaducts and a 700m road tunnel by the end of 2018 at a cost of around $770 million. The work is being done by a joint venture of China Road and Bridge Corp from mainland China, Taiwan’s Continental Engineering and Hong Kong-based Kaden Construction - the CRBC-CEC-Kaden JV.

“We needed surface drill rigs for open cut of the hills by drill and break. Tunneling jumbos for tunnel excavation and then high-quality mobile crushers to crush the excavated rock,” said K Y Chow, construction manager for the joint venture.

For drilling duty, a Ranger DQ500 and a Ranger DX700 were working on site but the joint venture also bought three Ranger DX800 surface drill rigs.

The drill rigs were used for the open cut of the hills by drill and break. Drill and blast was forbidden because blasting was not permitted on the type of hill cut along the highway.

The Ranger DX800, however, proved to be highly suited to the application. One of the new features is the revolving superstructure enabling large drilling coverage from the standard 17.6m² to a US standard 26.4m². When rotating, the rig’s stability is guaranteed because the counterweight remains always on the opposite side of the boom.

The rig also features a THC700 drilling control system that automatically adjusts to changing rock formations. It also sends an optimal amount of power to the rock to ensure smooth rotation, solid rock contact and fast penetration in different rock conditions.

Low fuel consumption is achieved by an ecopackage that includes engine RPM adjustment. Tramming force has been boosted by over 10%, according to 325 Sandvik.

For excavation of the dual two-lane tunnel, Sandvik supplied three DT1230i's and one DT820-SC tunneling jumbos. These were required because each tunnel is 14m wide and 11m high for two lines of traffic on the two main tunnels, along with some small cross passage tunnels. The Sandvik DT1230i is a computer-controlled three-boom electro-hydraulic drilling jumbo for tunneling and cavern excavation of 20 211m² cross sections, including face drilling, bolt hole drilling and mechanised long-hole drilling.

The DT1230i is coupled with the iSURETM tunnel management programme, intelligent iDATA control system, newly-launched high-frequency RD525 drills, robust booms and advanced drill string guides.

Sandvik QJ241 tracked jaw crushers have been crushing excavated granite for the tunnel’s road base. The QJ241 has handled the 600mm feed-size to produce a 250mm product. This is further fed into the second Sandvik QJ241 to produce a 40mm product for tunnel refilling.

The self-propelled QJ241 is Sandvik’s smallest compact tracked jaw crusher. It is fitted with a hydraulic raise-and-lower facility on the main conveyor making it ideal for hard rock applications.

A full service and maintenance agreement was signed between Sandvik and the CRBC-CEC-Kaden JV, as well as Sandvik providing all spare parts, lube and oil.

For more information on companies in this article

Related Content

  • MOBA’s innovative drill control offers efficiency
    February 8, 2013
    MOBA continues to develop its novel MDS-2000 drilling system. This package has already proven itself in use for blast hole drilling in many operations and can now be used to record the orientation of the machine with GNSS antennae and the height using laser reference. With telesupport, MOBA also offers fast service through an Internet connection. By recording the machine orientation using two GNSS antennae, the torsion on the machine can be determined with very high accuracy and included in the calculation
  • Wirtgen exhibiting diverse machine range at bauma China
    November 12, 2014
    The Wirtgen Group is exhibiting a wide range of its latest machines for the local market at bauma China 2014 in Shanghai. The firm is showing 11 innovations and no fewer than 13 products manufactured locally at the Langfang factory for the Chinese market, from its Road and Mineral Technologies divisions. There are 38 exhibits in total from the Wirtgen Group’s Wirtgen, Vögele, Hamm and Kleemann brands that are tailored to meet Chinese requirements. The Wirtgen brand is exhibiting its powerful WR 250 reclaim
  • Wirtgen exhibiting diverse machine range at bauma China
    January 6, 2017
    The Wirtgen Group is exhibiting a wide range of its latest machines for the local market at bauma China 2014 in Shanghai. The firm is showing 11 innovations and no fewer than 13 products manufactured locally at the Langfang factory for the Chinese market, from its Road and Mineral Technologies divisions. There are 38 exhibits in total from the Wirtgen Group’s Wirtgen, Vögele, Hamm and Kleemann brands that are tailored to meet Chinese requirements. The Wirtgen brand is exhibiting its powerful WR 250 reclaim
  • LiuGong has major plans for future corporate development
    December 10, 2015
    LiuGong unveiled new machines as well as its plans for the future at the BICES 2015 construction equipment show in Beijing recently. Trading conditions are tough in China at the moment, but LiuGong is performing better financially than many of its local rivals according to the firm. LiuGong’s vice-president, Dave Beatenbough said that the firm is particularly well known for its wheeled loaders, a product line for which the firm is a market leader in China. However, he explained that the company is actively