Skip to main content

Rockster machines operating in Tanzania extraction operation

Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock. The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is e
May 14, 2018 Read time: 3 mins
The Rockster Jaw Crusher R800 crushes lead ore in Chunya to a size of 0-40 mm using screenbox and return belt
Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock.


The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is easy to liberate by smelting.

The company has many different sites in the Mbeya Region in the United Republic of Tanzania, working in a territory of about 80km2. Exploration works are carried out by excavation as well as using vertical and inclined prospecting drilling, a driving of trenches, vertical and inclined holes.

One of the sites is located near Chunya in Tanzania’s Mbeya Region. The firm started to work at the site in May 2017 first excavating the upper layers of the soil and taking out the first samples of ore for analysis. After positive results of the geological tests the firm started its main extraction operation.

The firm brought in the 8790 Rockster R800 jaw crusher to crush the Galena to a fraction of 0-40mm. To define this final grain size, the firm use an RS83 screenbox with an RB75 return belt on the crushing plant. After that the firm changes the crushing units and continues crushing the 0-40mm material with the impact crusher R900 to a fraction of 0-5 mm. This material is sent to a leaching company to separate the pure ore which is then used for the production of concentrates based on polymetallic ores.

Rockster sales representative Maksim Perminov commissioned the machine and did the training and instruction at the customer’s site in Tanzania. He said, “After finding out the requirements of the PB Mining Company I was sure that the Rockster Duplex-System would be the best solution to receive the final grain quality they need with the lowest costs possible. The uniformity of the ore mass is very important for them. As the Galena rock has a very high abrasiveness, it requires a primary crushing on the jaw crusher to reduce the wear of blow bars when working on a rotary crusher.”

The PB Mining Company’s 2-in-1 crushing plant has proven successful in producing the necessary 0-5mm final grain. Using this equipment has done away with the need for purchasing, maintaining and transporting separate crushers. By using the jaw as primary crusher the firm saves wear and maintenance costs. The secondary impact crusher also delivers a good product shape and quality, allowing the firm to crush the Galena in the most ecological and cost efficient way.

For more information on companies in this article

Related Content

  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Mobile crusher quickly meets aggregate demand
    February 27, 2012
    Last year's flooding in the Australian state of New South Wales left the roads in the Richmond Valley in a poor state with 400km in need of urgent repair. To quickly meet the aggregate demand for the work, Richmond Valley Council called on contract crushing specialist M&M Crushing to produce 100,000tonnes of 20mm road base and 7mm, 10mm and 14mm graded aggregates from Peterson's Quarry.
  • Road recycling
    September 27, 2023
    Easier to operate, thanks to the increasing use of GPS, and greener to run because of biofuels are two of the more innovative technologies being integrated into machine design by major road recycling equipment manufacturers.
  • Arja Group offers range of new crushers
    January 6, 2017
    The Arja Group is broadening its range of crushing and screening equipment with its latest generation of impact crushers. The new series TAURO 10 PE models join the range, along with the durable MA 0806 jaw crushers and HN 36-3 screens. The new impact crushers are designed to work with highly abrasive materials and can also be used for soft materials. The firm claims that these impact crushers offer benefits over cone crushers in terms of material shape and reduced fines. The new TAURO 10 PE features advanc