Skip to main content

Remote control crushing

Following a trial of Metso Minerals' Nordberg Plant Management System at Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry. Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.
July 16, 2012 Read time: 2 mins
RSSFollowing a trial of Metso Minerals' Nordberg Plant Management System at 2644 Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry.

Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.

"We've seen how easy it is to get process information into our office computers," said Hanson unit manager Simon Swinford. "Just by logging into the Metso extranet I have access to all our machines. I can now view production tonnes, fuel consumption and effective crushing reports from all of the Metso machines in our quarry. It's a great help in monitoring how the machines are being used."

The LT110 and two LT300HP's also have the belt-way system for reporting production tonnage, and all of them are connected to the Metso PM reporting system. Tonnes per hour and cumulative tonnes are all now reported via the web interface.
The Nordberg Plant Management System collects data from the machines' control systems and transmits it wirelessly via GSM/GPRS. The heart of the system is the ACN C65 Metso data collection unit, a robust, industrial IP65-certified computer developed by Metso to operate in tough production environments. The reports produced can be opened on any computer connected to the Internet, usernames and passwords guarantee security of access for all registered users.

Hanson Aggregates' Lithalun Quarry also has a service agreement with Metso and the plant management system helps service personnel to monitor data such as the running hours completed by each machine. According to Paul Allen, Metso's field service manager, it allows contractual service obligations to be scheduled well in advance.

The Nordberg Plant Management System can be installed on most Lokotrack LT mobile crushing plants and ST mobile screens equipped with IC series automation control systems. Installation can be carried out on site.

RSS

For more information on companies in this article

Related Content

  • Compaction control boosts efficiency
    April 13, 2012
    Effective compaction control is one of a series of technical innovations boosting performance efficiency – Mike Woof writes. Maximising compaction efficiency can be a major cost factor on construction projects. Both for soil and asphalt compaction sectors, the risk from leaving an area under or over-compacted is substantial.
  • GPS technology developments
    June 13, 2012
    The use of GPS-inclusive technology is proving invaluable to contractors responsible for major transport-related construction projects across the globe. Guy Woodford looked at some of the latest and imminent site solutions featuring GPS Staff at Trimble Heavy Construction based in Sunnyvale, California recently finished developing three new solutions for connecting the construction site. The Trimble Connected Office, the Trimble Connected Controller and the Trimble Connected Machine, are all now available t
  • Caterpillar eyes better performance in 2015 amid stormy weather
    May 13, 2015
    Caterpillar vice president Paolo Fellin sums up the past year for the global equipment manufacturer and looks at the increasing importance of telematics and machine control. David Arminas reports from Caterpillar’s Demonstration and Learning Centre in Malaga, southern Spain First the good news. Despite the difficulties, especially of the financial markets, 2014 was “a record year for a lot of things” for global heavy equipment maker Caterpillar.Now the bad news. Hang onto your seats because despite some
  • Breaking at the face
    July 16, 2012
    Italian customer Marocca Group is using an Indeco HP18000 hydraulic breaker (the heaviest hydraulic breaker on the market at present) for primary demolition at a limestone quarry in Anagni, close to capital Rome. The 40ha quarry produces high grade limestone in 21 different sizes to meet an array of construction needs, and the bespoke fully automated crushing and screening plant is able to process over 500m³/hour of rock. By using the HP18000 in a primary winning application, Marocca Group has also been abl