Skip to main content

Remote control crushing

Following a trial of Metso Minerals' Nordberg Plant Management System at Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry. Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.
July 16, 2012 Read time: 2 mins
RSSFollowing a trial of Metso Minerals' Nordberg Plant Management System at 2644 Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry.

Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.

"We've seen how easy it is to get process information into our office computers," said Hanson unit manager Simon Swinford. "Just by logging into the Metso extranet I have access to all our machines. I can now view production tonnes, fuel consumption and effective crushing reports from all of the Metso machines in our quarry. It's a great help in monitoring how the machines are being used."

The LT110 and two LT300HP's also have the belt-way system for reporting production tonnage, and all of them are connected to the Metso PM reporting system. Tonnes per hour and cumulative tonnes are all now reported via the web interface.
The Nordberg Plant Management System collects data from the machines' control systems and transmits it wirelessly via GSM/GPRS. The heart of the system is the ACN C65 Metso data collection unit, a robust, industrial IP65-certified computer developed by Metso to operate in tough production environments. The reports produced can be opened on any computer connected to the Internet, usernames and passwords guarantee security of access for all registered users.

Hanson Aggregates' Lithalun Quarry also has a service agreement with Metso and the plant management system helps service personnel to monitor data such as the running hours completed by each machine. According to Paul Allen, Metso's field service manager, it allows contractual service obligations to be scheduled well in advance.

The Nordberg Plant Management System can be installed on most Lokotrack LT mobile crushing plants and ST mobile screens equipped with IC series automation control systems. Installation can be carried out on site.

RSS

For more information on companies in this article

Related Content

  • INTERMAT launch for Atlas Copco Edge Drill Monitor
    April 16, 2012
    Atlas Copco used INTERMAT to launch the Edge Drill Monitor – an innovative system of measuring shock waves from down-the-hole drilling. Information about the hammer and the bit is displayed graphically in real time, allowing the operator to extract maximum performance and efficiency as geology changes during the drilling process, to maintain the correct degree of flushing and avoid tool breakage.
  • Engine improvements for decarbonisation
    June 5, 2024
    As the need for decarbonisation becomes more pressing, engine firms are looking ahead to the next step for power systems, writes Mike Woof.
  • Parsons wins US-Canada bridge contract
    October 7, 2016
    Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.