Skip to main content

Remote control crushing

Following a trial of Metso Minerals' Nordberg Plant Management System at Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry. Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.
July 16, 2012 Read time: 2 mins
RSSFollowing a trial of Metso Minerals' Nordberg Plant Management System at 2644 Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry.

Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.

"We've seen how easy it is to get process information into our office computers," said Hanson unit manager Simon Swinford. "Just by logging into the Metso extranet I have access to all our machines. I can now view production tonnes, fuel consumption and effective crushing reports from all of the Metso machines in our quarry. It's a great help in monitoring how the machines are being used."

The LT110 and two LT300HP's also have the belt-way system for reporting production tonnage, and all of them are connected to the Metso PM reporting system. Tonnes per hour and cumulative tonnes are all now reported via the web interface.
The Nordberg Plant Management System collects data from the machines' control systems and transmits it wirelessly via GSM/GPRS. The heart of the system is the ACN C65 Metso data collection unit, a robust, industrial IP65-certified computer developed by Metso to operate in tough production environments. The reports produced can be opened on any computer connected to the Internet, usernames and passwords guarantee security of access for all registered users.

Hanson Aggregates' Lithalun Quarry also has a service agreement with Metso and the plant management system helps service personnel to monitor data such as the running hours completed by each machine. According to Paul Allen, Metso's field service manager, it allows contractual service obligations to be scheduled well in advance.

The Nordberg Plant Management System can be installed on most Lokotrack LT mobile crushing plants and ST mobile screens equipped with IC series automation control systems. Installation can be carried out on site.

RSS

For more information on companies in this article

Related Content

  • Trimble's ruggedised tablet for site use
    May 15, 2019
    Trimble is now offering its T7 Tablet, a rugged, lightweight and versatile device for construction surveying applications. The unit features the Trimble Siteworks Software for construction surveying, allowing it to provide real-time data to visualise cut/fill levels, calculate material volumes, check grade and communicate work orders. This can allow users to to improve productivity and decision-making. Scott Crozier, general manager for Trimble’s Civil Engineering and Construction Division said, “Surveyors
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Concrete plant efficiency with new machines
    August 14, 2019
    New technology for concrete production will help boost efficiency New advances in concrete plant technology will help boost materials quality for users. The latest machines are more versatile and more productive than previous generation equipment. Ease of transport and fast assembly/disassembly and commissioning are other important factors for the latest plants. Research and development is an important issue for all manufacturers in the segment. With Liebherr for example having two new laboratory mixe
  • Concrete plant innovations coming to market
    December 12, 2022
    An array of advanced technologies are now coming to market for the concrete plant segment. Manufacturers are developing new systems that offer rewards in output quality and productivity, while also benefiting from sophisticated systems that allow gains in material logistics