Skip to main content

Recycling road gully waste

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies pro
September 26, 2013 Read time: 4 mins
Processing road gully waste can deliver quality aggregates for re-use

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution

The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies providing gully emptying services. The effects have been felt not only in the UK but also by other countries in the EC.

Whilst the revised Waste Framework Directive (rWFD) details that all EU Member States recycle a minimum of 70% of waste generated from construction, demolition and excavated material (CD&E) by the year 2020, the UK is in the top 10 countries in Europe for recycling CD&E waste. However in terms of recycling road sweepings and gully waste Europe is leading the way and the UK should take a few lessons from its European cousins.

In the UK each winter over 2 million tonnes of rock salt and grit is spread onto the road networks at a cost of over £150 million/year. With this material eventually going to landfill the irony is that in the following year the 2309 Highways Agency struggles to provide adequate supplies for the next cold spell. Many European countries currently recycle road grit to re-mix with salt for spreading on the highways. In order for the UK to stay in the top 10 of recycling countries in Europe, road grit and gully waste could be the next initiative. The technology is available now to recoup what is currently a wasted resource, and such actions will protect stocks of virgin aggregates. 

Road sweepings comprise mainly of grit from road dressings, small grade aggregate, organic material, ferrous products and a small amount of hydrocarbons, however up to 98% of the material is capable of being processed and reclaimed. The saline constituent of the rock salt is dissolved and washed out but the grit and the aggregate material that remains is reclaimable. The reclaimed grit can be remixed with rock salt and reused and the larger aggregates can be reclaimed and used for other applications. Sand or grit forms 50% of the overall material recycled, with 40% being larger aggregate and the organic material constituting the remaining 10% can be composted.
Gully waste typically comprises of small stones, sand, gravel, grit, ferrous material, paper litter and hydrocarbons with organic matter mixed in. However, the main constituent of gully waste, even when the free water has been allowed to drain off is water. As this constitutes up to 60% of the total volume of gully waste, it seems foolish to send it to land fill.

However the UK is picking up the pace. In January 2012 Warwickshire County Council in the UK installed a recycling facility for road sweepings and gully waste in Wolverhampton, working with six waste disposal authorities in the region. Like many local authorities, Warwickshire County Council was sending its road sweepings and gulley waste to landfill.  7506 CDEnviro installed a 15tonne/hour recycling system which included a full water treatment system. SITA UK operates the facility under contract which is capable of treating up to 40,000tonnes of material/year. During the project in excess of 300,000tonnes of material will be diverted from landfill, creating in excess of £10 million cashable efficiency savings over seven years, with the projected increase of the overall material recycled being in excess of 3%.  

Peter Craven from CDEnviro said, “We have seen great uptake in the concept of road grit and gully waste recycling in the UK and through our partners in Europe. With the processing of this material being charged at approximately 50% of the cost to landfill it makes economic sense without even taking into consideration the recycling of the processed material. This technology has led to a reduction in waste going to landfill of up to 75%, whilst producing a high value product.”

For more information on companies in this article

Related Content

  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have
  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Concrete barriers help to minimise accidents
    July 12, 2012
    Concrete barriers offer a highway safety solution - Mike Woof writes. Concrete safety barriers are being installed on many of Europe's major highways, particularly for use as centre lane dividers. The strength and durability of concrete barriers can help reduce the risk of cross over accidents, one of several topics raised at a conference in Brussels on concrete highway barriers organised by the European Concrete Paving Association, EUPAVE. The conference was opened by Yves Deceoene of the IRF's Belgian ex