Skip to main content

Recycling road gully waste

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies pro
September 26, 2013 Read time: 4 mins
Processing road gully waste can deliver quality aggregates for re-use

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution

The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies providing gully emptying services. The effects have been felt not only in the UK but also by other countries in the EC.

Whilst the revised Waste Framework Directive (rWFD) details that all EU Member States recycle a minimum of 70% of waste generated from construction, demolition and excavated material (CD&E) by the year 2020, the UK is in the top 10 countries in Europe for recycling CD&E waste. However in terms of recycling road sweepings and gully waste Europe is leading the way and the UK should take a few lessons from its European cousins.

In the UK each winter over 2 million tonnes of rock salt and grit is spread onto the road networks at a cost of over £150 million/year. With this material eventually going to landfill the irony is that in the following year the 2309 Highways Agency struggles to provide adequate supplies for the next cold spell. Many European countries currently recycle road grit to re-mix with salt for spreading on the highways. In order for the UK to stay in the top 10 of recycling countries in Europe, road grit and gully waste could be the next initiative. The technology is available now to recoup what is currently a wasted resource, and such actions will protect stocks of virgin aggregates. 

Road sweepings comprise mainly of grit from road dressings, small grade aggregate, organic material, ferrous products and a small amount of hydrocarbons, however up to 98% of the material is capable of being processed and reclaimed. The saline constituent of the rock salt is dissolved and washed out but the grit and the aggregate material that remains is reclaimable. The reclaimed grit can be remixed with rock salt and reused and the larger aggregates can be reclaimed and used for other applications. Sand or grit forms 50% of the overall material recycled, with 40% being larger aggregate and the organic material constituting the remaining 10% can be composted.
Gully waste typically comprises of small stones, sand, gravel, grit, ferrous material, paper litter and hydrocarbons with organic matter mixed in. However, the main constituent of gully waste, even when the free water has been allowed to drain off is water. As this constitutes up to 60% of the total volume of gully waste, it seems foolish to send it to land fill.

However the UK is picking up the pace. In January 2012 Warwickshire County Council in the UK installed a recycling facility for road sweepings and gully waste in Wolverhampton, working with six waste disposal authorities in the region. Like many local authorities, Warwickshire County Council was sending its road sweepings and gulley waste to landfill.  7506 CDEnviro installed a 15tonne/hour recycling system which included a full water treatment system. SITA UK operates the facility under contract which is capable of treating up to 40,000tonnes of material/year. During the project in excess of 300,000tonnes of material will be diverted from landfill, creating in excess of £10 million cashable efficiency savings over seven years, with the projected increase of the overall material recycled being in excess of 3%.  

Peter Craven from CDEnviro said, “We have seen great uptake in the concept of road grit and gully waste recycling in the UK and through our partners in Europe. With the processing of this material being charged at approximately 50% of the cost to landfill it makes economic sense without even taking into consideration the recycling of the processed material. This technology has led to a reduction in waste going to landfill of up to 75%, whilst producing a high value product.”

For more information on companies in this article

Related Content

  • The dark arts of asphalt production
    January 5, 2017
    Asphalt production is a complex process featuring many variables - Mike Varner, chief engineer at Astec Inc discussed methods with Mike Woof Asphalt production in a black art in more ways than one. It involves a complex process of mixing bitumen with aggregates under temperature and optimising this operation is crucial to maximise quality. But with so many variables, determining exactly what is going on inside an asphalt plant involves extensive research, sophisticated computer modelling and the use of a
  • Tasmania to get used tyre crumbing plant
    March 14, 2022
    The project is part of the Australian state’s move towards more crumb rubber for road asphalt.
  • Advanced technologies will increase the wear life of bitumen further
    February 28, 2012
    Bitumen has been used for thousands of years, but now a wide variety of products are available that can be added to it to produce blends with improved properties. According to the Refined Bitumen Association (RBA) bitumen is the oldest known engineering material. Indeed, the organisation says that its versatility as a construction material is unparalleled, and having been used as an adhesive, sealant and waterproofing agent for over 8,000 years, its uses include the construction and maintenance of roads, ai
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public