Skip to main content

Recycling road gully waste

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies pro
September 26, 2013 Read time: 4 mins
Processing road gully waste can deliver quality aggregates for re-use

Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution

The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies providing gully emptying services. The effects have been felt not only in the UK but also by other countries in the EC.

Whilst the revised Waste Framework Directive (rWFD) details that all EU Member States recycle a minimum of 70% of waste generated from construction, demolition and excavated material (CD&E) by the year 2020, the UK is in the top 10 countries in Europe for recycling CD&E waste. However in terms of recycling road sweepings and gully waste Europe is leading the way and the UK should take a few lessons from its European cousins.

In the UK each winter over 2 million tonnes of rock salt and grit is spread onto the road networks at a cost of over £150 million/year. With this material eventually going to landfill the irony is that in the following year the 2309 Highways Agency struggles to provide adequate supplies for the next cold spell. Many European countries currently recycle road grit to re-mix with salt for spreading on the highways. In order for the UK to stay in the top 10 of recycling countries in Europe, road grit and gully waste could be the next initiative. The technology is available now to recoup what is currently a wasted resource, and such actions will protect stocks of virgin aggregates. 

Road sweepings comprise mainly of grit from road dressings, small grade aggregate, organic material, ferrous products and a small amount of hydrocarbons, however up to 98% of the material is capable of being processed and reclaimed. The saline constituent of the rock salt is dissolved and washed out but the grit and the aggregate material that remains is reclaimable. The reclaimed grit can be remixed with rock salt and reused and the larger aggregates can be reclaimed and used for other applications. Sand or grit forms 50% of the overall material recycled, with 40% being larger aggregate and the organic material constituting the remaining 10% can be composted.
Gully waste typically comprises of small stones, sand, gravel, grit, ferrous material, paper litter and hydrocarbons with organic matter mixed in. However, the main constituent of gully waste, even when the free water has been allowed to drain off is water. As this constitutes up to 60% of the total volume of gully waste, it seems foolish to send it to land fill.

However the UK is picking up the pace. In January 2012 Warwickshire County Council in the UK installed a recycling facility for road sweepings and gully waste in Wolverhampton, working with six waste disposal authorities in the region. Like many local authorities, Warwickshire County Council was sending its road sweepings and gulley waste to landfill.  7506 CDEnviro installed a 15tonne/hour recycling system which included a full water treatment system. SITA UK operates the facility under contract which is capable of treating up to 40,000tonnes of material/year. During the project in excess of 300,000tonnes of material will be diverted from landfill, creating in excess of £10 million cashable efficiency savings over seven years, with the projected increase of the overall material recycled being in excess of 3%.  

Peter Craven from CDEnviro said, “We have seen great uptake in the concept of road grit and gully waste recycling in the UK and through our partners in Europe. With the processing of this material being charged at approximately 50% of the cost to landfill it makes economic sense without even taking into consideration the recycling of the processed material. This technology has led to a reduction in waste going to landfill of up to 75%, whilst producing a high value product.”

For more information on companies in this article

Related Content

  • Global growth in machine rental
    May 20, 2015
    The machine rental sector is undergoing significant expansion worldwide – Dan Gilkes reports. Plant hire, equipment rental, leasing, call it what you will, being able to use a machine when and where you need it, with no further concerns relating to ownership costs, depreciation or sudden repair bills, remains a compelling argument for many contractors. Which is one of the main reasons for the continued growth in popularity of equipment rental across the world. Rental has been big business in the UK, the US
  • Fast, cost-effective road stabilisation
    February 15, 2012
    The Kivikko industrial area in Finland, which is owned by the City of Helsinki, has expanded gradually over the years and it has expanded again with the new stabilised area now about 3.5hectares. The ALLU equipment and system was used to stabilise Kivikko for the first time in 2001, and the latest job started in June 2010 with the stabilisation work completed by mid-December 2010. [The ALLU Stabilisation System is a Finnish invention that provides a fast, cost-effective and environmental-friendly working
  • UK: FM Conway and Nynas agree Thames River bitumen storage deal
    April 15, 2015
    Infrastructure services contractor FM Conway has signed a deal to supply Nynas, a UK provider of bitumen binder, with bitumen from its recently rebuilt Imperial Wharf terminal. The facility is on the River Thames in the town of Gravesend, near the mouth of the river and down river from London. FM Conway invested around €3.5 million to refurbish the terminal which was finished last September. The terminal has the capacity to dock and store up to 7,500tonnes of bitumen. Under the deal, Nynas will bas
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.