Skip to main content

Poland’s major highway project is connecting the country

Concrete producer CEMEX is playing a key role in the construction of one of Poland’s main highway projects. The new S7 highway link will connect the Baltic coast to cities such as Warsaw, Kraków, and the Slovakian border region. In all over 400,000m3 of concrete is being supplied by CEMEX for the highway, with the material being used to build civil structures such as flyovers and bridges as well as drainage.
October 18, 2017 Read time: 2 mins
The new bridge on the S7 route faced construction challenges due to the poor ground conditions

Concrete producer 3016 CEMEX is playing a key role in the construction of one of Poland’s main highway projects. The new S7 highway link will connect the Baltic coast to cities such as Warsaw, Kraków, and the Slovakian border region.

In all over 400,000m3 of concrete is being supplied by CEMEX for the highway, with the material being used to build civil structures such as flyovers and bridges as well as drainage.

An important part of the S7 highway project is the construction of a 920m bridge that spans the Vistula River. This bridge is on the stretch of highway joining Koszwaly to Nowy Dwor Gdanski in the north of Poland. The construction of the bridge is challenging from a technical viewpoint however as the ground conditions are poor. The underlying soils are not well suited to supporting large civil structures and have to be firstly cleaned before ground support could be installed. The bridge structure is supported by concrete piles, with the material being supplied by two mobile batching plants located close to the site of the bridge.

The two plants were able to supply 1,500m3 of concrete/day on average and up to 2,500m3 of concrete/day at peak periods. For the duration of the project CEMEX is supplying 410,000m3 of concrete in all, as well as in excess of 1 million tonnes of aggregates.

Several technologies were utilised for the bridge construction portion of this highway project. The bridge beams were slid out from the side of the river onto the bridge supports. Additional concrete was then used, with a high-quality architectural grade being utilised for the exposed surfaces so as to maximise the bridge’s aesthetics.

The construction work faced other challenges too, including tough winter conditions as well as high water levels because of melting snow at the beginning of the year. This posed issues due to partial flooding of the area around the bridge, although it had been anticipated and the construction team had planned accordingly.

For more information on companies in this article

Related Content

  • Tensar’s route to Euro 2012
    July 20, 2012
    Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.
  • New bridge in Colombia using materials from CEMEX
    March 7, 2018
    A new bridge project in Colombia is benefiting from the supply of concrete from CEMEX Latam Holdings The project is to build a new bridge for Colombia’s Río Magdalena 2 Highway, with the road being one of the primary infrastructure projects currently under development in the country. CEMEX Colombia is supplying concrete for several essential elements of the project, including a viaduct over the Magdalena River that will become one of the longest bridges in the country.
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Loaders assist in Chinese concrete production facility
    September 8, 2014
    A fleet of wheeled loaders is playing an important role at a site producing concrete in China. Located at Lintong in Shaanxi Province, in China, the site is producing concrete using gravel from river plains. Lintong lies 35km to the east of Xi’An in western China, the site of the famous Terracotta Army. This new army of SDLG wheeled loaders meanwhile is being used to load gravel from the nearby river plains for Jinsheng Concrete, which sits on the 800km Wei River.