Skip to main content

New crusher for Russian quarry upgrade

The largest marble quarry in Russia is now benefiting from the first CI512 Prisec HSI crusher in the country. The machine is working at the Koelga Quarry, the largest Russian marble quarry, and one of the world’s largest. Supplied by Sandvik’s Russian distributor, Quarry Service, the CI512 Prisec operates 24 hours/day and the machine has improved the cubicity of the end product and boosted productivity by up to 50%, while decreasing noise emissions. Koelga Marble is Russia’s market leader in the prod
May 5, 2015 Read time: 2 mins
The new crusher has helped increase and optimise output at the quarry
The largest marble quarry in Russia is now benefiting from the first CI512 Prisec HSI crusher in the country.

The machine is working at the Koelga Quarry, the largest Russian marble quarry, and one of the world’s largest. Supplied by 325 Sandvik’s Russian distributor, Quarry Service, the CI512 Prisec operates 24 hours/day and the machine has improved the cubicity of the end product and boosted productivity by up to 50%, while decreasing noise emissions.

Koelga Marble is Russia’s market leader in the production of micro-powders, producing, and selling, 40,000tonnes of this material/month, as well as 25,000tonnes/ month of various rubble fractions.

Since acquiring the CI512, the machine has been in almost continuous operation 24 hours/day. Scheduled and proactive service stops have meant that productivity has been increased, and operational efficiency maximised. At the same time the productivity of the production process has increased by 40-50%.

This machine is said to ensure greater reduction ratios than previously obtainable. It benefits from an infinite hydraulic curtain adjustment combined with a brake positioning system which relieves pressure, and setting, when uncrushable objects enter the crusher.

Crusher blockages have previously been a problem at Koelga Marble, especially when operating in a primary mode. Removal of the blockage, with the combined downtime and health and safety risks encountered, are now eliminated with the new generation crusher.

For more information on companies in this article

Related Content

  • Caterpillar’s 313F excavator and M318 wheel loader shine in Spain
    May 19, 2015
    Caterpillar’s hallmark has been to stake its brand value on the ability to improve on products already considered very good. So it was with some pride that the global group unveiled its new 313F L GC tracked excavator during a dealer and media demonstration conference in Malaga, southern Spain in early March. The 313’s close cousin is the 312E, a high-use machine designed to put in long hours to maximise the owner’s productivity over the machine’s life cycle. The machine’s owner likely gets paid by the h
  • Beijing's BICES reflects China's economic growth
    February 27, 2012
    The busy BICES show reflects China’s booming infrastructure investment and growing economy – Mike Woof reports. The recent BICES trade show in capital Beijing was extremely busy, with high visitor attendance levels and crowded aisles. The interest in the event strongly reflects the country’s massive infrastructure growth, which continues to develop. The construction equipment business has been identified as a key economic priority by the Chinese Government, with manufacturers being offered numerous incentiv
  • Boom in Morocco's road construction materials
    February 10, 2012
    The strong road construction market in Morocco is helping boost the quarrying market in the country substantially. One such operation exists near the town of Ben Slimane, situated north of Casablanca. Agregat Oued Cherrat (AOC) owns a 65ha quarry, one of the largest of the 14 in the region and when the firm decided to buy new excavators, it also opted to buy Hitachi machines. AOC placed an order for one ZX330-3, with the second delivered three months later and the company now has three ZX330-3s, with a four
  • Asphalt plant upgrade in Germany
    May 8, 2019
    An asphalt plant upgrade has helped boost long-term efficiency for a producer in southern Germany. The firm, Fiegl, based in Bavaria, invested in a new asphalt mixing plant four years ago. More recently, the firm also replaced the plant’s baghouse. The retrofit has since helped lower the plant’s emissions, noise output and fuel consumption. The time frame for the retrofit was tight because it was important to avoid lengthy downtime and production outages in mid-season. This meant that the changeover had to