Skip to main content

New Astec asphalt plant for Mexico City

Astec has commissioned a highly sophisticated asphalt plant in Mexico City to meet specific customer needs for a high quality output with minimal environmental impact. Equipped with Astec’s latest technology, this is a low emissions plant and is the first in Latin America that features the firm’s V-Pack Stack Temperature Control. The low emissions performance was a key factor in the supply deal, so as to meet the needs of the authorities in Mexico City. The plant is equipped with Astec’s Phoenix Talon low
December 19, 2017 Read time: 3 mins
The Astec plant in Mexico City is configured to handle RAP, while it also features low emissions

1250 Astec has commissioned a highly sophisticated asphalt plant in Mexico City to meet specific customer needs for a high quality output with minimal environmental impact

Equipped with Astec’s latest technology, this is a low emissions plant and is the first in Latin America that features the firm’s V-Pack Stack Temperature Control. The low emissions performance was a key factor in the supply deal, so as to meet the needs of the authorities in Mexico City.

The plant is equipped with Astec’s Phoenix Talon low emissions burner with silencer, so it minimises fumes as well as operating noise. The plant can also use a recycled feed with up to 50% RAP and has been fitted with dual RAP bins, while it also has a Green System capable of making warm mix. The plant was also specified with three NG Silos allowing long-term storage (three days guaranteed by Astec).

The plant was specified with a four-compartment cold feed system and a weighing system as well as a dual deck scalping screen. The plant is designed to meet sustainability targets and its 2.44m Double Barrel drum is capable of using a feed containing 50% RAP. In addition, the low emissions Phoenix Talon burner can be fuelled by either gas or oil and is equipped with an Air Blower Silencer for quieter operation.

The plant has Astec’s novel Double Barrel Green System, which can be utilised for making warm mix while it is also equipped with the firm’s sophisticated V-pack Stack Temperature Control System. Important capabilities of this plant configuration include the ability to control stack temperature, achieve a wider veil of aggregates and eliminate hot spots. The user can also change mix designs easily with no need for time-consuming flight changes while the configuration is also said to ensure increased drum efficiency.

The plant is capable of maintaining production at 7% moisture at an altitude of 2,200m. It has an inertial separator system with a Pulse Jet Baghouse that includes aramid fibre bags for more precise dust control as well as offering enough capacity to run RAP. There are three large AC tanks, two of which have mixer agitators capable of storing polymer asphalt binders. Other features include dual recycle feed bins, a RAP scalping screen with weighbridge, PMII mix blending controls, dual hot oil heaters, twin pump asphalt metering and a 350 DBL dry additive system.

For more information on companies in this article

Related Content

  • Asphalt plants reduce emissions, increase efficiency
    February 20, 2012
    Solutions for a reduction in emissions, recycling and more efficiency are being introduced by major asphalt plant manufacturers as Patrick Smith reports. The demand to reduce all types of emissions and increase the use of recycled material has put pressure on industry to come up with answers, and asphalt production is no exception.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • A new Marini asphalt plant for Strabag
    April 20, 2023
    Austria’s major contractor Strabag recently decided to purchase a new Marini Class Tower asphalt plant
  • The best solution for using RAP in the asphalt mix
    September 28, 2023
    Sophisticated solutions allows the use of RAP in asphalt mixes.