Skip to main content

Mixes for India's infrastructure

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes. Through Marini India, the Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India. Marini says that its new generation of energy-efficient asphalt plants has been devel
April 4, 2012 Read time: 3 mins
One of the Marini MAC plants chosen by Navayuga Engineering Company for work on the Armur-Adloor Yellareddy road project

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes.

Through 273 Marini India, the 2779 Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India.

Marini says that its new generation of energy-efficient asphalt plants has been developed to meet customers' demands for versatility, quality and environmentally-friendly requirements.

The first Marini MAC commissioned by a team of engineers from Marini India produced around 1,200tonnes of high quality mix on day one and is now moving to another project site.

"No foundations, modular designs, zero ducts and minimal interfaces, ensured that the plant was put in to operation in a very short time," says Marini.

To minimise energy consumption at all process stages, the MAC uses a combination of innovative design along with waste heat recovery system. The dryer and blue flame-assisted burner design is said to "offer savings of over 20%.

In another development, 1236 RAMKY Infrastructure is installing MAC plants on its large pan-India projects, with the first being set up near Moradabad, some 160km miles from Delhi.

The MAC delivered to RAMKY has been supplied with multi-fuel capabilities, RAP (reclaimed asphalt pavement) processing abilities and other green features.

During the first phase of work at the recently opened Terminal 3 at Indira Gandhi International Airport, Delhi, which boasts the longest runway in Asia, Larsen & Toubro (L&T) produced over 650,000tonnes of asphalt in six months. It used two Marini MAP plants of 200tonnes and 260tonnes/hour capacity, the largest production capacity ever installed in India. The plants have been relocated to road projects in Gujarat and Tamil Nadu, two of India's 28 states.

Two 200tonnes/hour Marini plants have also been employed on work at Mumbai's Chhatrapati Shivaji International Airport, and other plants from the company are involved in work on most of the other new airports in India including international airports in Bangalore and Hyderabad.

Meanwhile, construction company 1237 KMC, which has a long association with Marini, is to install another Marini plant for a prestigious 183km road project in Andhra Pradesh state, with production expected to star in February 2011.

Over ten years ago, KMC took delivery of two Marini MAP 175s, and has since produced over 1.5 million tonnes of asphalt, having completed several road projects and been relocated many times.

One of the plants is now installed on the Pink City Expressway project, which involves six-laning 225.6km of the Gurgaon-Kotputli-Jaipur section of National Highway 8.

For more information on companies in this article

Related Content

  • Fayat is positioned for growth
    January 6, 2017
    Market conditions are tough, according to Jean-Claude Fayat, executive managing director of the Fayat Group. He said, “From my point of view this crisis is not over. We have a slow recovery but this is a structural crisis and a new balance has to be found.” Despite the difficult conditions, the company is performing well and Fayat said, “Our group turnover is around €3.7 billion/year. We are a family group and we have never wanted to be on the stock exchange.” The European market has become less important
  • Fayat is positioned for growth
    April 18, 2013
    Market conditions are tough, according to Jean-Claude Fayat, executive managing director of the Fayat Group. He said, “From my point of view this crisis is not over. We have a slow recovery but this is a structural crisis and a new balance has to be found.” Despite the difficult conditions, the company is performing well and Fayat said, “Our group turnover is around €3.7 billion/year. We are a family group and we have never wanted to be on the stock exchange.” The European market has become less important
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Lintec supplies plants for Brazilian highway project
    August 18, 2015
    German manufacturer LINTEC has supplied three of its highly sophisticated, containerised asphalt mixing plants for use on the important BR-163 highway project in Brazil. This is one of several major plant orders for the firm for use in road projects in Latin America. According to LINTEC, its activity in this market is helping contribute to the construction of high quality roads that will last.