Skip to main content

Mixes for India's infrastructure

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes. Through Marini India, the Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India. Marini says that its new generation of energy-efficient asphalt plants has been devel
April 4, 2012 Read time: 3 mins
One of the Marini MAC plants chosen by Navayuga Engineering Company for work on the Armur-Adloor Yellareddy road project

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes.

Through 273 Marini India, the 2779 Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India.

Marini says that its new generation of energy-efficient asphalt plants has been developed to meet customers' demands for versatility, quality and environmentally-friendly requirements.

The first Marini MAC commissioned by a team of engineers from Marini India produced around 1,200tonnes of high quality mix on day one and is now moving to another project site.

"No foundations, modular designs, zero ducts and minimal interfaces, ensured that the plant was put in to operation in a very short time," says Marini.

To minimise energy consumption at all process stages, the MAC uses a combination of innovative design along with waste heat recovery system. The dryer and blue flame-assisted burner design is said to "offer savings of over 20%.

In another development, 1236 RAMKY Infrastructure is installing MAC plants on its large pan-India projects, with the first being set up near Moradabad, some 160km miles from Delhi.

The MAC delivered to RAMKY has been supplied with multi-fuel capabilities, RAP (reclaimed asphalt pavement) processing abilities and other green features.

During the first phase of work at the recently opened Terminal 3 at Indira Gandhi International Airport, Delhi, which boasts the longest runway in Asia, Larsen & Toubro (L&T) produced over 650,000tonnes of asphalt in six months. It used two Marini MAP plants of 200tonnes and 260tonnes/hour capacity, the largest production capacity ever installed in India. The plants have been relocated to road projects in Gujarat and Tamil Nadu, two of India's 28 states.

Two 200tonnes/hour Marini plants have also been employed on work at Mumbai's Chhatrapati Shivaji International Airport, and other plants from the company are involved in work on most of the other new airports in India including international airports in Bangalore and Hyderabad.

Meanwhile, construction company 1237 KMC, which has a long association with Marini, is to install another Marini plant for a prestigious 183km road project in Andhra Pradesh state, with production expected to star in February 2011.

Over ten years ago, KMC took delivery of two Marini MAP 175s, and has since produced over 1.5 million tonnes of asphalt, having completed several road projects and been relocated many times.

One of the plants is now installed on the Pink City Expressway project, which involves six-laning 225.6km of the Gurgaon-Kotputli-Jaipur section of National Highway 8.

For more information on companies in this article

Related Content

  • India: government mulls making NH-8 an expressway to Daulapura
    October 21, 2015
    India is considering a 28km expressway connecting the south of Indira Gandhi Airport in Delhi to Daulapura on National Highway-8. The project, which hopes to ease traffic on NH-8 that connects Gurgaon and Jaipur, is estimated to cost more than US$5 billion, according to a report in the Business Standard. The NH-8 connects New Delhi, the federal capital, with Mumbai, on India’s western coast.
  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • It’s in with the new for asphalt plants
    April 4, 2013
    A leading asphalt plant manufacturer is playing a key role in the upgrade of a major European airport, while another is said to have created one of the most modern plants in Europe. Meanwhile, a host of new plants and plant concepts have been, or are about to be, unveiled. Guy Woodford reports Intrame says its ultra-mobile UM-280 asphalt plant has played a key role in the resurfacing of the runway and taxiways at Gatwick Airport in southern England – the busiest single runway airport in the world. Around 35
  • Mumbai Airport on the up
    August 24, 2012
    To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006. As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly u