Skip to main content

Mixes for India's infrastructure

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes. Through Marini India, the Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India. Marini says that its new generation of energy-efficient asphalt plants has been devel
April 4, 2012 Read time: 3 mins
One of the Marini MAC plants chosen by Navayuga Engineering Company for work on the Armur-Adloor Yellareddy road project

Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes.

Through 273 Marini India, the 2779 Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India.

Marini says that its new generation of energy-efficient asphalt plants has been developed to meet customers' demands for versatility, quality and environmentally-friendly requirements.

The first Marini MAC commissioned by a team of engineers from Marini India produced around 1,200tonnes of high quality mix on day one and is now moving to another project site.

"No foundations, modular designs, zero ducts and minimal interfaces, ensured that the plant was put in to operation in a very short time," says Marini.

To minimise energy consumption at all process stages, the MAC uses a combination of innovative design along with waste heat recovery system. The dryer and blue flame-assisted burner design is said to "offer savings of over 20%.

In another development, 1236 RAMKY Infrastructure is installing MAC plants on its large pan-India projects, with the first being set up near Moradabad, some 160km miles from Delhi.

The MAC delivered to RAMKY has been supplied with multi-fuel capabilities, RAP (reclaimed asphalt pavement) processing abilities and other green features.

During the first phase of work at the recently opened Terminal 3 at Indira Gandhi International Airport, Delhi, which boasts the longest runway in Asia, Larsen & Toubro (L&T) produced over 650,000tonnes of asphalt in six months. It used two Marini MAP plants of 200tonnes and 260tonnes/hour capacity, the largest production capacity ever installed in India. The plants have been relocated to road projects in Gujarat and Tamil Nadu, two of India's 28 states.

Two 200tonnes/hour Marini plants have also been employed on work at Mumbai's Chhatrapati Shivaji International Airport, and other plants from the company are involved in work on most of the other new airports in India including international airports in Bangalore and Hyderabad.

Meanwhile, construction company 1237 KMC, which has a long association with Marini, is to install another Marini plant for a prestigious 183km road project in Andhra Pradesh state, with production expected to star in February 2011.

Over ten years ago, KMC took delivery of two Marini MAP 175s, and has since produced over 1.5 million tonnes of asphalt, having completed several road projects and been relocated many times.

One of the plants is now installed on the Pink City Expressway project, which involves six-laning 225.6km of the Gurgaon-Kotputli-Jaipur section of National Highway 8.

For more information on companies in this article

Related Content

  • Marini’s asphalt plants’ debut
    January 6, 2017
    Fayat’s Marini operation has been highly successful in China and the company intends to capitalise with the launch of new products for this market. Marini’s MAC 320 plant has sold in large numbers to China and the firm plans to further increase sales with its new series of asphalt batching plants. These are being introduced at the bauma China exhibition and the complete MAC range will feature six basic models, each of which is available in two configurations with a hot mix asphalt silo under the mixer or
  • Marini’s asphalt plants’ debut
    November 20, 2012
    Fayat’s Marini operation has been highly successful in China and the company intends to capitalise with the launch of new products for this market. Marini’s MAC 320 plant has sold in large numbers to China and the firm plans to further increase sales with its new series of asphalt batching plants. These are being introduced at the bauma China exhibition and the complete MAC range will feature six basic models, each of which is available in two configurations with a hot mix asphalt silo under the mixer or
  • Aggregate data aids hot mix asphalt production
    July 4, 2012
    Hot-mix asphalt (HMA) is produced at specialised facilities where various mixtures of aggregate are heated and dried, combined with liquid asphalt cement (also known as bitumen), and either stored in insulated silos or loaded into trucks and transported to a job site. Aggregate heating and drying is accomplished with various types of dryers, depending on whether a batch or continuous process is used. The continuous mix process uses aggregate drum dryers, designed to heat and dry measured quantities of grave
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around