Skip to main content

Kraton expands duty range of its polymer products

The pavement industry needs to come up with novel solutions in order to meet the twin challenges of climate change and squeezed budgets. This was the message from Kraton Polymers market development manager Rombout Hartemink when he addressed FIRM13. Hartemink illustrated the properties of Kraton’s modified bitumen with the aid of his stretchy bar. This 250mm-long bar of Highly Modified Bitumen stretches to five or six times its length, returning to its original state in around five minutes. “It changes
August 23, 2013 Read time: 3 mins
Cost Comparison

The pavement industry needs to come up with novel solutions in order to meet the twin challenges of climate change and squeezed budgets. This was the message from Kraton Polymers market

development manager Rombout Hartemink when he addressed FIRM13. Hartemink illustrated the properties of 715 Kraton’s modified bitumen with the aid of his stretchy bar. This 250mm-long bar of Highly Modified Bitumen stretches to five or six times its length, returning to its original state in around five minutes. “It changes people’s mindset,” said Hartemink. “It helps them to understand that this is an elastomeric product extended with bitumen.

“If you have such a transformational product,” he continued, “you can achieve dramatically different costs in certain applications.” HiMA contains 7.5% SBS polymer, but unlike bitumen normally modified with this quantity of polymer, is not stiff and unworkable.

Hartemink’s presentation of HiMA applications around the world included the case of a US cul-de-sac, damaged by heavy garbage trucks. Microsurfacing using standard emulsion and aggregates had failed, so that the solution being used was the expensive one of  a 25mm ‘mill and fill’ layer of hot asphalt which came in at around $14.4/m2 ($12.00/yd2, see Fig.2).
By using HiMA microsurfacing, this cost was cut to under a third of the hot mix option, costing around $4.2/m2 ($3.60/yd2, see Fig.2). “I used this example because it tells us that we can consider microsurfacing applications for roads where we might normally not think about them,” said Hartemink.

Brazil also supplied an example of a ‘dramatically different’ solution.  Standard road construction in Brazil sees the binder course and wearing course laid over a cement stabilised base, rather than the European construction of base course, binder course and wearing course.

By using a thinner but better HiMA layer over a reduced cement stabilised base layer, the road depth has been reduced by 37% compared to traditional Brazilian road construction. This equates to cost savings of 32% and 37% respectively (see Fig.1) while improving the resistance to reflective cracking from the base.
“This shows a different design based on a thinner but better asphalt layer and a dramatically reduced amount of cement-stabilised base leading to a dramatic cost reduction,” said Hartemink.

Although uptake of innovative technologies in Europe can be limited by the specification and approval processes under traditional forms of contract, there are still opportunities in cases where the contractor has an ongoing responsibility for maintenance – as is the case for the concessionaire contracts in Brazil.

"With toll roads in France, and now that we see more term contracts in European countries such as the UK, people are interested in innovative solutions, they want to listen and talk," said Hartemink.

Honeywell Titan's additive extends paving season

A trial section of road in Alaska is being used to showcase two of the benefits that Honeywell’s new bitumen additive, Honeywell Titan, can bring to paving. First it can extend paving seasons: the trial took place in October, with temperatures that fell to -10°C during one night; and second, it raised the performance grade (BG) of the bitumen to create a stiffer road for the heavy traffic it experiences, which should extend the road’s life.

Honeywell Titan is a low weight, ethylene-based polyolefin added at the asphalt plant. It comes in a powder form, has a low molecular weight and a melting point of 115°-140°C. In terms of cost, Wood said that Honeywell Titan is competitive with other modifiers in the industry. “We believe if you look at the cost in use, Honeywell Titan will be cost-effective.”













For more information on companies in this article

Related Content

  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Wonderful ways with rubber for asphalt
    August 2, 2023
    This month we look at two novel technologies that take circularity to the next level – transforming waste tyre rubber into a valuable asphalt constituent
  • LafargeHolcim delivers Algeria concrete road solution
    May 14, 2018
    In Algeria, LafargeHolcim has introduced roller compacted concrete (RCC) for the first time in the country to renovate the RN45 road, with reduced costs, construction time and increased durability - *Nicolas Miravalls. Heavy traffic on a road stretch in northern Algeria has resulted in the need for rebuilding of the link, making it better able to cope with demand. In Algeria’s Msila region, the RN 45 road carries over 700 heavy load trucks/day, 365 days/year and required a major re-construction. In 2017, La
  • Panama highway rebuilt with concrete
    January 5, 2017
    A highway link to the north of Panama´s capital city that connects with a national park popular with tourists, has now been rebuilt Cement producer and concrete specialist CEMEX carried out a study into the project, to find a cost effective solution. And working with CEMEX, Panama’s Ministry of Public Works began planning for the project in 2015. A 5.7km stretch of the highway has now been improved, with the road structure being built from concrete.