Skip to main content

Kleemann's new generation

At Steinexpo 2008, Kleemann exhibited its MC 120 Z jaw crusher from the new generation of MOBICAT jaw crushers, as well as the mobile MOBISCREEN MS 16 D screening plant. The MC 120 Z, a classical quarrying machine, is also well suited for concrete recycling, says the German company, a member of the Wirtgen Group. With its 1,200mm wide and 800mm deep crusher inlet, it is designed for a feed capacity of up to 400tonnes/hr, and has a number of features that are said to contribute to its highly efficient operat
July 30, 2012 Read time: 2 mins
MOBISCREEN MS 16 D mobile screening plant with triple-deck screening unit
At Steinexpo 2008, 261 Kleemann exhibited its MC 120 Z jaw crusher from the new generation of MOBICAT jaw crushers, as well as the mobile MOBISCREEN MS 16 D screening plant.

The MC 120 Z, a classical quarrying machine, is also well suited for concrete recycling, says the German company, a member of the 364 Wirtgen Group.

With its 1,200mm wide and 800mm deep crusher inlet, it is designed for a feed capacity of up to 400tonnes/hr, and has a number of features that are said to contribute to its highly efficient operation. One example is pre-screening by means of the active double-deck heavy-duty screen, making sure that only those materials are fed into the crusher that are intended for processing. Another example is the standard vibrating discharge chute below the crusher. It reduces wear and tear at the 140mm wide belt of the main discharge conveyor, thus considerably increasing the plant's operational safety and availability.

The plant's exclusively electrical drives (with the exception of travel drive and crusher gap setting) enable it to be operated with tremendous economic efficiency, which can be increased even further by the optional connection to an external power source.

This is matched entirely by the mobile MOBISCREEN MS 16 D screening unit, says Kleemann. Its 8m³ large, slotted screen can be folded by means of wireless remote control and permits a feed capacity of up to 350tonnes/hr. The triple-deck screening machine with a convenient screening width of 1,520mm permits four different grain sizes to be produced in one single working pass, which are then stockpiled via the plant's generously dimensioned, rugged discharge conveyors.

For more information on companies in this article

Related Content

  • China's increased aggregates production
    April 16, 2012
    A new range of equipment from SHANBAO has helped to increase limestone production to meet Henan Province's aggregates demand. SHANBAO has supplied a full range of equipment to two companies in a growth region of China.The Chinese-based manufacturer of stationary crushing and screening equipment supplied the equipment to Yongsheng Aggregates and Yongye Trading. The crushing, screening and feeding equipment is being used to process limestone that supplies 10% of the aggregate requirements in the Henan region'
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • RAP Drum Benninghoven’s system in counter flow – The RAP solution for the future
    May 21, 2014
    Benninghoven’s Ralf Port talks about the German firm’s development with partner BAM of its counter flow parallel drum system for RAP material The asphalt industry constantly searches for new solutions in order to optimise processes within the asphalt plant. A major subject is the increase of RAP content in all recipes. Recycling Parallel Drum Systems work in various sizes and at various power levels. This technique has been established by different producers over the decades. However, all kinds of concepts
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc