Skip to main content

Concrete plant for Mali contractor

A contractor in Mali has increased its concrete production capabilities with the addition of a third Eurotec ECO concrete batching plant. The new ECO90 joins the existing ECO30 and ECO50 machines already used by the firm, Z For Mining (ZFM).
June 19, 2023 Read time: 2 mins
Contractor ZFM in Mali has added an ECO90 plant from Eurotec to its production capabilities, bringing its range of units from the firm to three

The new ECO90 plant is located in Mali’s capital Bamako and will be used by ZFM to supply high-quality concrete to local contractors.

ZFM has been keen on Eurotec machinery ever since it acquired its first model, a second-hand ECO30, from a local contractor in 2013. The company, which provides contracting services such as road building and the civil works across the West African nation, immediately set the plant to work. Soon after this, ZFM acquired a brand-new ECO50 model that was used for shotcreting underground tunnels. Daily production output of both the ECO30 and the ECO50 varied between 10-100m3 in response to the needs of the project and client requests.

Most recently, ZFM took delivery of a new Eurotec ECO90. This plant has begun operations and is supplying ready-mix concrete to local contractors. With an output of up to 90m3/hour with mixer size at 2m3 per batch, the ECO90 features a cement weigher and water weigher, both of which are accurately metered using load cells. Optional additive weighers can also operate in conjunction with Eurotec’s in-house developed ECS process control system software. The ECS program runs on Windows OS and helps to produce a precise and consistent blend. The steel structure and interior abrasion-proof linings of the ECO90’s twin-shaft mixer are said to ensure durable performance while mixing particles of up to 150mm in diameter.

After arriving onsite, the plants can be installed quickly as they need minimal foundations. The aggregate bins are designed to enable materials to be loaded easily, with minimal ramps.

Zeidan Zeidan, managing director, ZFM said, “With our long experience and strong reputation in the construction sector, it is vital that we continue to deliver the best possible service to our clients, and this is why we add extra value by hiring expat operators to oversee production. These operators have been highly trained in the art of producing concrete in the optimum way, as well as efficiently carrying out preventive maintenance to ensure our plants always remain operational and ready to serve.”

Both online and in-person customer service are said to ensure that should issues arise with the plants, they are swiftly identified and resolved.

For more information on companies in this article

Related Content

  • Aggregate Industries lightens the load for the Acton Swing Bridge
    October 2, 2018
    Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon. The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its
  • Innovative surfacing
    February 29, 2012
    UK firm Hanson hopes to attain key sustainability targets with its new ERA asphalt product. This energy reducing asphalt delivers a 50% reduction in carbon emissions while enhancing durability and improving health and safety for contractors. It can also use up to 50% recycled content, while the asphalt itself is 100% recyclable. The Hanson ERA production process allows a wide range of base, binder and surface course materials to be produced at temperatures of 80 and 95°C, compared with up to 190°C for equiv
  • Concrete barrier challenge
    April 11, 2012
    The 5700C-Max unit from Power Curbers has now been used on a tricky shoulder widening job in New South Wales, Australia. The machine carried out the job close to Robertson in the Southern Highlands, about 1.5 hours drive to the south of Sydney. The job required the construction of a 200m long section of barrier, built to the requirements of the Roads and Traffic Authority (RTA). The contractor hand-formed the concrete shoulder as it was about 3m wide at the start and narrowed down to 1m at the end.
  • New tests, new technology, new users: why materials testing is a growing market
    February 7, 2017
    A look back at some of the developments this year, and a look ahead to what may come next reveals the increasing use of materials testing. New technology and new ways to process and analyse data will drive change even further - Kristina Smith reports For materials testing equipment manufacturers, constant change is business as usual. New tests emerge, new standards are written and new practices spread around regions and the world. There are also new materials to deal with: bitumen modified with polymers