Skip to main content

Concrete plant for Mali contractor

A contractor in Mali has increased its concrete production capabilities with the addition of a third Eurotec ECO concrete batching plant. The new ECO90 joins the existing ECO30 and ECO50 machines already used by the firm, Z For Mining (ZFM).
June 19, 2023 Read time: 2 mins
Contractor ZFM in Mali has added an ECO90 plant from Eurotec to its production capabilities, bringing its range of units from the firm to three

The new ECO90 plant is located in Mali’s capital Bamako and will be used by ZFM to supply high-quality concrete to local contractors.

ZFM has been keen on Eurotec machinery ever since it acquired its first model, a second-hand ECO30, from a local contractor in 2013. The company, which provides contracting services such as road building and the civil works across the West African nation, immediately set the plant to work. Soon after this, ZFM acquired a brand-new ECO50 model that was used for shotcreting underground tunnels. Daily production output of both the ECO30 and the ECO50 varied between 10-100m3 in response to the needs of the project and client requests.

Most recently, ZFM took delivery of a new Eurotec ECO90. This plant has begun operations and is supplying ready-mix concrete to local contractors. With an output of up to 90m3/hour with mixer size at 2m3 per batch, the ECO90 features a cement weigher and water weigher, both of which are accurately metered using load cells. Optional additive weighers can also operate in conjunction with Eurotec’s in-house developed ECS process control system software. The ECS program runs on Windows OS and helps to produce a precise and consistent blend. The steel structure and interior abrasion-proof linings of the ECO90’s twin-shaft mixer are said to ensure durable performance while mixing particles of up to 150mm in diameter.

After arriving onsite, the plants can be installed quickly as they need minimal foundations. The aggregate bins are designed to enable materials to be loaded easily, with minimal ramps.

Zeidan Zeidan, managing director, ZFM said, “With our long experience and strong reputation in the construction sector, it is vital that we continue to deliver the best possible service to our clients, and this is why we add extra value by hiring expat operators to oversee production. These operators have been highly trained in the art of producing concrete in the optimum way, as well as efficiently carrying out preventive maintenance to ensure our plants always remain operational and ready to serve.”

Both online and in-person customer service are said to ensure that should issues arise with the plants, they are swiftly identified and resolved.

For more information on companies in this article

Related Content

  • Plain sailing for Caterpillar’s PM 300 series
    February 22, 2019
    Caterpillar’s revamped small cold planers have upped the stakes in the urban refurbishing market. World Highways deputy editor David Arminas recently caught up with A.J. Lee, global segment manager, on Spain’s Costa del Sol
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • It's all about profit, people and the planet
    February 18, 2025
    Sit in on our latest roundtable discussion on sustainability in the construction and aggregates industries, brought to you by Global Highways and Aggregates Business. AB editor Guy Woodford has been talking to two world-class experts: Jeremy Harsin from Cummins and Michael Gomes from Topcon. Make your planning, your workflows, your contract tenders, and your sites as sustainable as possible. “Sustainability is really about profit, people and the planet,” say our experts. “Being able to drive that is the work that matters.”
  • Emerson Industrial develops innovative leak-free drive system
    January 6, 2017
    From Emerson Industrial Automation come a novel worm gear reducer that is leak-free for 18 months. The patented Morse Raider Plus has a roll-burnished seal journal and double-lip seals, designed to keep contaminants out and lubrication in. A quill liner system is fitted to make disassembly less of a challenge. The product is said to be ideal for use in conveyors, mixers and bucket elevators. The computerised gear centering optimises the gear mesh for reduced heat and debris formation, eliminating backlash a