Skip to main content

Concrete plant for Mali contractor

A contractor in Mali has increased its concrete production capabilities with the addition of a third Eurotec ECO concrete batching plant. The new ECO90 joins the existing ECO30 and ECO50 machines already used by the firm, Z For Mining (ZFM).
June 19, 2023 Read time: 2 mins
Contractor ZFM in Mali has added an ECO90 plant from Eurotec to its production capabilities, bringing its range of units from the firm to three

The new ECO90 plant is located in Mali’s capital Bamako and will be used by ZFM to supply high-quality concrete to local contractors.

ZFM has been keen on Eurotec machinery ever since it acquired its first model, a second-hand ECO30, from a local contractor in 2013. The company, which provides contracting services such as road building and the civil works across the West African nation, immediately set the plant to work. Soon after this, ZFM acquired a brand-new ECO50 model that was used for shotcreting underground tunnels. Daily production output of both the ECO30 and the ECO50 varied between 10-100m3 in response to the needs of the project and client requests.

Most recently, ZFM took delivery of a new Eurotec ECO90. This plant has begun operations and is supplying ready-mix concrete to local contractors. With an output of up to 90m3/hour with mixer size at 2m3 per batch, the ECO90 features a cement weigher and water weigher, both of which are accurately metered using load cells. Optional additive weighers can also operate in conjunction with Eurotec’s in-house developed ECS process control system software. The ECS program runs on Windows OS and helps to produce a precise and consistent blend. The steel structure and interior abrasion-proof linings of the ECO90’s twin-shaft mixer are said to ensure durable performance while mixing particles of up to 150mm in diameter.

After arriving onsite, the plants can be installed quickly as they need minimal foundations. The aggregate bins are designed to enable materials to be loaded easily, with minimal ramps.

Zeidan Zeidan, managing director, ZFM said, “With our long experience and strong reputation in the construction sector, it is vital that we continue to deliver the best possible service to our clients, and this is why we add extra value by hiring expat operators to oversee production. These operators have been highly trained in the art of producing concrete in the optimum way, as well as efficiently carrying out preventive maintenance to ensure our plants always remain operational and ready to serve.”

Both online and in-person customer service are said to ensure that should issues arise with the plants, they are swiftly identified and resolved.

For more information on companies in this article

Related Content

  • New low emission, versatile asphalt plant from Marini
    January 6, 2017
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
  • Upgrade for Russian quarry
    February 22, 2012
    In Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951.
  • Connectivity is key for contractors
    November 8, 2022
    Michigan Department of Transportation (MDOT) has planned its US$210 million I-69 Rebuild Project in Eaton and Calhoun Counties, work that will improve journeys for drivers in the area
  • Astec Industries CEO and president Ben Brock says stay focused and true to win
    July 8, 2016
    Core values, constant innovation and looking after the customer are the key drivers for Ben Brock, chief executive officer and president of Astec Industries. How does he keep his company ahead of the pack and what does he think that the future holds? if you ask Ben Brock to explain how his Astec Industries group has managed to do so well for so long, he doesn’t even pause for breath. “That’s easy, I thank the good doctor. He always told me: do good work and take care of the customer ... which is exactl