Skip to main content

Building india's new Hyderabad-Bangalore motorway

The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions. It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.
February 9, 2012 Read time: 2 mins
MB crusher buckets are working on the new Hyberrabad-Bangalore motorway
The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions.

It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.

Italian company 283 MB is supplying crusher buckets to help build the motorway: the BF120.4 bucket will be used to produce the stabilised pavements every 50km.

According to MB a feature of the BF120.4 is that it is the only piece of equipment capable of reducing the size of crushed granite from 20cm to 4cm, thus "making the job easier and more versatile." The Breganze-based company (currently in the process of obtaining the ISO 14001 certification) says that its buckets work using the hydraulic system of the excavator they are fitted to, and, "unlike traditional crushers, offer significantly reduced transportation and waste disposal costs, thus allowing inert materials to be recycled." Guido Azzolin, managing director of MB, said: "We are extremely optimistic on the successful outcome of the motorway that will connect the cities of Hyderabad and Bangalore, both extremely excited to try out our highly technological, Italian-made buckets and to obtain a new communication line that we are sure will be appreciated by the Indian country."

For more information on companies in this article

Related Content

  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Terex in Red Diesel Replacement programme
    September 15, 2023
    The UK government has chosen six projects to move forward within the Red Diesel Replacement programme as a way to decarbonise construction, mining and quarrying.
  • ALLU D-Series Screener Crusher bucket handles wet or dry material
    January 16, 2017
    The newest D-Series Screener Crusher bucket from ALLU screens, crushes pulverises, aerates, blends, mixes, separates, feeds and loads materials all in one stage. This combined stage is designed to increase an operation’s efficiency and profitability, according to ALLU, the system’s manufacturer.
  • Material reduction process in Mexico
    October 9, 2019

    A quarrying operation in Mexico has switched to using a drum cutting attachment supplied by 283 MB Crusher, instead of using explosives for blasting. The customer says that this change in working operations has delivered major benefits in terms of efficiency. The company is now able to deliver a more consistent grade of material in terms of both quality and size. Using the drum cutter attachment ensures that there are lower waste fines produced, as well as no over-sized material requiring secondary breaking at additional cost.