Skip to main content

Building india's new Hyderabad-Bangalore motorway

The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions. It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.
February 9, 2012 Read time: 2 mins
MB crusher buckets are working on the new Hyberrabad-Bangalore motorway
The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions.

It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.

Italian company 283 MB is supplying crusher buckets to help build the motorway: the BF120.4 bucket will be used to produce the stabilised pavements every 50km.

According to MB a feature of the BF120.4 is that it is the only piece of equipment capable of reducing the size of crushed granite from 20cm to 4cm, thus "making the job easier and more versatile." The Breganze-based company (currently in the process of obtaining the ISO 14001 certification) says that its buckets work using the hydraulic system of the excavator they are fitted to, and, "unlike traditional crushers, offer significantly reduced transportation and waste disposal costs, thus allowing inert materials to be recycled." Guido Azzolin, managing director of MB, said: "We are extremely optimistic on the successful outcome of the motorway that will connect the cities of Hyderabad and Bangalore, both extremely excited to try out our highly technological, Italian-made buckets and to obtain a new communication line that we are sure will be appreciated by the Indian country."

For more information on companies in this article

Related Content

  • Indian quarry boosts wear life and output
    June 20, 2016
    An Indian quarry facility has seen increased uptime and gains in overall efficiency due to the installation of new wear components in its crushing system Installing new distributor plates in this Indian granite quarry has increased its plate operational lifetime by 400-500%. Panchami Stone has fitted the unique HX900 plates to the 85 HP rotor of its Sandvik Construction CV218 VSI, reducing its replacement costs by 50%. The Panchami Stone granite quarry is located 60km from Bangalore, in the south of I
  • Mixes for India's infrastructure
    February 13, 2012
    Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes.
  • Mixes for India's infrastructure
    April 4, 2012
    Marini has been involved for some years in supplying asphalt plants to Indian companies involved in road and airport construction programmes. Through Marini India, the Fayat Group company installed what it claims is India's "greenest asphalt plant" for Navayuga Engineering Company, which chose a Marini MAC plant for work on the PPP Armur-Adloor Yellareddy road project on the Nagpur-Hyderabad section in central India. Marini says that its new generation of energy-efficient asphalt plants has been devel
  • National Highway Authority of India (NHAI) rolls out new PPP regime
    January 11, 2016
    Financially delinquent contractors working on Indian projects will, from now on, find they are labelled a “non-performer” and barred from further work until they remedy their cash flow. The move by the National Highway Authority of India (NHAI) is an attempt to speed up site work and complete public-private partnership road projects on time. Under the new policies, firms that delay construction or fail to inject their share of capital into their projects will be barred from participating in fresh bids un