Skip to main content

Benninghoven’s mobile asphalt plant

Benninghoven says that its new ECO asphalt mixing plant combines high output and mobility, while its TBA asphalt mixing plant is now available with a hot-gas generator for the first time. Made in the firm’s German factory, the new ECO plants can produce 100-320tonnes/hour of asphalt. The new plants are said to combine the latest innovations in asphalt production technology from Benninghoven with a high standard of manufacturing. Mobility is a key feature as the plant comes in compact container sizes. Thi
May 24, 2019 Read time: 3 mins
Benninghoven’s new ECO plant offers high mobility
Benninghoven says that its new ECO asphalt mixing plant combines high output and mobility, while its TBA asphalt mixing plant is now available with a hot-gas generator for the first time.


Made in the firm’s German factory, the new ECO plants can produce 100-320tonnes/hour of asphalt. The new plants are said to combine the latest innovations in asphalt production technology from 167 Benninghoven with a high standard of manufacturing. Mobility is a key feature as the plant comes in compact container sizes. This design means that ECO plants can be operated as stationary systems but can also allow for rapid location changes.

The modular design of the ECO series also allows various high-tech components to be integrated afterwards. In this way, asphalt producers can then also react to future customer and market requirements – particularly when it comes to solutions for asphalt recycling. The plant is supplied with an integrated mixed material loading silo, available with capacities of 10-325tonnes and this is said to ensure a sufficient buffer whilst also providing storage capacity for up to seven different asphalt types. Thanks to the modular system, this can be expanded or retrofitted at any time with one or two secondary towers.

Because all main ECO plant components are designed in ISO standard container dimensions, transport by lorry, ship or rail is said to be simplified. The advantages of the container design of ECO asphalt mixing plants is apparent during installation and commissioning, with both stages being completed in just five weeks. On conventional plants, four to six months can pass before the first vehicles carrying the asphaltic mixture leave for the construction site.

Benninghoven ECO plants also offer operating companies the highest levels of versatility, while keeping logistics costs low. ECO plants can be made ready for operation quickly at new locations, not least due to the design of the plant electrics with components installed ready for use.


Meanwhile the firm’s TBA transportable asphalt mixing plants offer outputs of 160–320tonnes/hour and are suitable for semi-mobile and stationary use. The design of the main components in container format with plug-in wiring makes these plants easier to transport and also reduces set-up times. Modular in design, the plants offer versatility and are available with options, recycling feed systems and continuous retrofitting options.

Large storage capacities are claimed for the hot bin section and mixed material loading silo offer. The intermediate storage of the dried, heated and sorted virgin mineral is available in capacities of 60, 80 and 130tonnes in five, six or seven bins.

An integrated mixed material loading silo with capacities of 42-517tonnes offers a buffer while providing storage capacity for up to seven asphalt types. The modular system allows this to be expanded or retrofitted at any time.

The TBA 2000, 3000 and 4000 have a 2, 3 or 4tonne mixer and ensure mixing capacities of 160, 240 or 320tonnes/hour.

For more information on companies in this article

Related Content

  • Chinese plant order for Lintec
    October 6, 2021
    Lintec-Linnhoff has supplied a major Chinese contractor with an asphalt batching plant to meet high output requirements. The contractor required a plant able to deliver over 3000tonnes of asphalt/day to keep pace with strong demand in the area
  • Mobile plant provides asphalt answer at airport
    September 30, 2013
    The project to upgrade Kassel-Calden Airport in Germany is providing a much improved facility. Opened in 1970, the original airport had a short runway that was not suited to predicted traffic volumes and current standards so a complete reconstruction of the facility has been carried out. The €271 million investment in the facility is expected by the developers to provide a strong economic benefit to the area. The original airport was built on an area of over 200ha and a new and longer runway has been con
  • Smart Astec plant for Florida firm
    August 18, 2015
    US-based P&S Paving has boosted output from its asphalt facility in Daytona, Florida with the purchase of a new plant from Astec Industries. The firm supplies a wide range of customers ranging from small urban works up to large highway projects for the Florida Department of Transportation. As a result the company needed a modern, versatile and productive plant capable of delivering an array of mixes and quantities, including high quality materials. Tim Phillips, president of P&S Paving said, “We want
  • Ammann’s new continuous asphalt plant innovation for North America is 100% mobile
    March 14, 2023
    A significant innovation from Ammann is a continuous asphalt plant being developed specifically for the North American market. This will offer capacity in the 270-360tonne/hour range that forms the bulk of US demand and will be ready for market during the 2024 paving season.