In Azerbaijan an Astec batching plant is said to be giving a major contractor an advantage over its competition The firm, Aztikintiyol, is one of the leading producers of aggregates and hot-mix asphalt in Azerbaijan and decided to expand its operations into the southern regions of the country. The need for asphalt in this area was growing as there is massive infrastructure development close to the border with neighbouring Iran taking place. However a simple plant was not suitable as the firm required
June 9, 2015 Read time: 4 mins
Aztikintiyol in Azerbaijan has gained a competitive advantage with an Astec asphalt batching plant capable of using up to 30% RAP in the mix
In Azerbaijan an Astec batching plant is said to be giving a major contractor an advantage over its competition

The firm, Aztikintiyol, is one of the leading producers of aggregates and hot-mix asphalt in Azerbaijan and decided to expand its operations into the southern regions of the country. The need for asphalt in this area was growing as there is massive infrastructure development close to the border with neighbouring Iran taking place.

However a simple plant was not suitable as the firm required versatile equipment capable of delivering multiple mix recipes. The client was also looking for reliable, high quality equipment capable of delivering high capacity, while using sophisticated hot-mix asphalt (HMA) technology.

According to the firm’s plant and maintenance superviser Mike Schafer, the 1250 Astec TS-5 Batch plant fitted the bill as it is capable of manufacturing up to 375tonnes of HMA/hour. The supply deal was competitive too as other highly regarded suppliers have a strong presence in the area.
But the firm opted for the Astec equipment as it was keen to buy a high quality plant featuring up-to-date technology and that would also deliver the reliability and versatility of product required, and at a competitive price. Having bought the first plant, the firm installed this in the small town of Bilasuvar, strategically located between Azerbaijan’s capital Baku and the Iranian border.

Aztikintiyol said that the purchase of the Astec batch plant has allowed it to deliver a continuous supply of HMA with consistent quality levels. And the plant also has the ability to produce many different types of mix for customers in the surrounding regions. The firm said that the plant has proved to be easy to operate and an important option is a control system in the local language, as well as the user-friendly interface.

Despite the size of the plant and its stationary nature, site preparation and set up took only 48 days to complete and start producing HMA. The fast set up was helped by support in the field from Astec service technicians and training of personnel on maintenance procedures and operation of the plant. The Astec plant will provide many decades of service to this region because of its reliability, strength of design, and the continuous support from Astec.

Three more Astec batch plants were installed and began production for the 2014 paving season. The company also has more plans in place to purchase and install more of the plants. This is because the Astec equipment has been proven in the application for HMA production.
With the new plant in place, Aztikintiyol has further established its position in the local market. Low production cost due to having its own sources of aggregates supply and low maintenance costs, combined with Astec’s patented technologies allow it to replace up to 30% of the aggregates and bitumen in most of the mix designs.

Using reclaimed asphalt pavement (RAP) has allowed the company to gain a substantial advantage as compared to the competition. At the same time, high capacity and reliability has allowed the company to meet high demands from the paving contractors.

During the first four months of production, the plant was able to produce more than 200,000tonnes of HMA, and had asphalt orders for the 2014 season of more than 400,000tonnes of asphalt. This was used to supply various contractors working in the region, both for federal and smaller-size jobs.

The goal for the company is to produce more than 1.2 million tonnes of asphalt in a paving season, according to Babek Salmanov, project leader at two portable asphalt plants located in the fast growing areas of Gabala and Savalan.

For more information on companies in this article

Related Content

  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece
  • Innovative paving techniques being utilised
    February 15, 2021
    Innovative warm mix materials are now being offered by key contractors to deliver longer surface life combined with more sustainable operations
  • Asphalt paving advances available
    June 24, 2024
    Several of the key manufacturers are introducing new developments for the US asphalt paving market with vibration only screeds – Mike Woof writes