Asphalt plans silos increase efficiency, reduce waste

A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
April 10, 2012 Read time: 4 mins
MHC's Portable Double Barrel plant installed in Bucaramanga, Colombia

A Colombian contractor tackles specifications for asphalt road work with Astec equipment

Award-winning Colombian contractor MHC has upgraded its 1250 Astec Portable Double Barrel plant to handle highway and other projects.

The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.

MHC is a USO 9001:2000 corporation presided over by Mario Huertas Cotes, and is a leading road contractor with headquarters in Colombia’s capital Bogota.

Established in 1975, it specialises in engineering and mining as well as dams, bridges, and heavy road construction using asphalt. On some of these roads MHC has remained as a concessionary partner with all maintenance operations.

In 1994, the company obtained the coveted National Engineering Prize for the Sesquile Dam, and it currently has two contracts with 2812 Invias (National Highway Institute).

One contract involves the rehabilitation and maintenance of roads located in Montería in the Department of Córdoba with a mix use of 15,000tonnes per month at an elevation of 305m above sea level.

One of the issues relating to the contract was the procurement of aggregates, which led the contractor to use limestone with “great results.”

The second contract was for the study, design, land use, social, environmental, and construction aspects of a 205km long, four-lane highway between Bucaramanga and Cúcuta in the Department of 4001 Santander.

The main issue with this project was obtaining the land to install the asphalt plant and crushing equipment. The end result was installing the Astec equipment in the limestone quarry at Surata outside the city of Bucaramanga.

According to president Mario Huertas, the Astec plant was the best solution to guarantee a permanent and ready supply of hot mix while meeting the contractor's specifications.

 “The delivered product is very homogenous and the plant is well below the local environmental gas emissions standards and calories (heat) emissions to the atmosphere,” he explained.

“The 95% uptime and safety features of the plant have greatly contributed to an overall cost reduction in production.”

He also noted the reduction in the cost of consumables, burner fuel and a reduction in the oxidation of the daily mix production.
Huertas praised the innovation of the Astec equipment when it came to the Double Barrel Green System and New Generation storage silos.

“The Green System added to the Double Barrel drum mixer allows me to reduce fuel consumption and increase production. The warm mix asphalt does not need the addition of expensive commercial additives: using water with the mix along with the liquid asphalt cement is all that is needed.

“We are able to store mix in the Astec New Generation HMA [hot mix asphalt] storage silo for four days without the loss of mix quality.”

By keeping the silo full, the plant is always ready to meet customer demand; equipment efficiency is maximised and material waste is reduced.

In storage mode, the silos are completely sealed at the top and the bottom to prevent oxidation.

“I have become convinced that silos allow you to increase daily production with a substantial reduction in operational costs for the mix made on the previous day, which allows a better and more efficient use of human resources to mix transport trucks to feed the road works,” said Huertas.”

To date, MHC has three 2987 Telsmith aggregate classifiers (Model 2561T); two impact crushers (Model FT4240); one vertical axis impact crusher 2500; one Astec Mobile Screens model PTSC (Model 3618Vm), and one ProSizer (Model 2612V).

“The relationship with Astec is a partnership that goes beyond basic customer service,” acclaimed Huertas.

“The Astec Group knows its products; knows how to relate the technologies to my applications, and knows how to provide excellence in customer service. This is evident through all Astec divisions and the people that represent the company, including our Colombia Astec agent, Rodriguez and Londono.”

Meeting the standards required by MHC's customers is not a problem, according to Huertas, who said Astec listened to his technical and business suggestions, thus allowing him to purchase equipment to provide better production, a reduced maintenance cost, and a better mix quality to his operations.

“In terms of service, Astec has been very effective, receptive, timely, and very experienced. With the conditions in Colombia, we need a good response on parts for routine maintenance.

“Astec has maintained the added value with its customers through its post-sale relationship between local agents and end customers.”

For more information on companies in this article

Related Content

  • Advances in asphalt plant production
    November 27, 2012
    Leading asphalt plant manufacturers have recently unveiled their latest products aimed at customers looking for significant efficiency gains through the use of durable and lasting technology. Guy Woodford looks at some of the new batch Benninghoven showcased a wide variety of its new and innovative asphalt plants and individual plant components during its week-long Open Days event last month at the German firm’s HQ in Mülheim. Launched earlier this year, the MMX80 Continuous Asphalt Plant is capable of prod
  • Colombian highway contracts awarded
    April 19, 2021
    Key Colombian highway construction contracts have been awarded.
  • Concrete production innovation – mobility the key
    July 5, 2016
    Versatility and productivity are key drivers for the concrete plant sector - Mike Woof writes. The days of most construction machines being expressly designed and built for a single specific purpose have gone. These days construction equipment is largely intended to be versatile and adaptable, allowing it to be operated in a wide array of applications and duties. New concrete plants are designed too for mobility as this allows users to set up highly productive equipment quickly on basic sites, with little p
  • Ammann develops versatile and productive mobile asphalt plant
    February 9, 2015
    Ammann claims that its new EcoBatch asphalt plant offers versatility and mobility in a single compact package. This modular plant can deliver 60-80tonnes/hour of high quality material for use in demanding road construction applications. The plant is said to be optimised to reduce wear and maintenance needs, with easy access for servicing. Jean-Luc Didier is sales director for Central-South Europe and said, “It has the same control system and accuracy in dosing as we have in the big plants. There’s no need f