Skip to main content

Ammann asphalt plant for UAE road construction

An asphalt plant supplied by Ammann is now playing an important role in the UAE’s road construction sector The plant is producing material for major new road projects in the UAE. “We need to produce quality asphalt, and high volumes of it,” said Adnan Elmasri, operations manager for Top Link Contracting & General Transportation, based in Dubai. Top Link, a major contractor in Abu Dhabi and Dubai, is providing mix for a new highway that will help to reduce the current traffic congestion issues occurring
October 5, 2018 Read time: 3 mins
An Ammann plant is playing a key role in the construction of a new highway section in the UAE
An asphalt plant supplied by Ammann is now playing an important role in the UAE’s road construction sector


The plant is producing material for major new road projects in the UAE.

“We need to produce quality asphalt, and high volumes of it,” said Adnan Elmasri, operations manager for Top Link Contracting & General Transportation, based in Dubai. Top Link, a major contractor in Abu Dhabi and Dubai, is providing mix for a new highway that will help to reduce the current traffic congestion issues occurring at peak periods on Ras Al Khaimah Road, one of the major thoroughfares. The new road connection will provide a bypass around Ras Al Khaimah and will also connect to the roads heading to the south of the UAE.

Top Link opted to acquire an 6791 Ammann ABA 260 UniBatch Asphalt Mixing Plant to meet its production requirements, as the firm knew this unit would meet its need in terms of output volumes and quantities.

The ABA UniBatch plants have proven successful since they were introduced by Ammann, due to the reliable performance. These plants are known for a low initial investment cost and their ability to be easily customised to match customer’s needs.

The new project is for the construction of a 40km highway stretch that is being designed with three lanes in either direction. Construction of the highway section commenced in 2016 and the route is due for completion towards the end of 2018. For this project, the ABA UniBatch is being used to produce more than 400,000tonnes of asphalt mix. Productivity is essential on a large-scale construction project such as this. “The plant can produce 260tonnes/hour,” Elmasri said. “The mix is a good quality and a good quantity.” The plant has also proven to be reliable, another important factor for a highway construction job where timely material deliveries are critical for project delivery.


Another feature of the plant that the contractor, Top Link, has also found useful is the proprietary Ammann as1 Control System. “The system is flexible and simple to use,” Elmasri said. “Everyone can use it. After a little time, it makes everyone look like a genius.”

With this plant having proven itself, Elmasri said Top Link plans to buy more Ammann asphalt mixing plants in the future. The company also recently took delivery on an Ammann EmulTEK plant, which is capable of producing high volumes of bitumen emulsion.

For more information on companies in this article

Related Content

  • Asphalt plant upgrade in Germany
    May 8, 2019
    An asphalt plant upgrade has helped boost long-term efficiency for a producer in southern Germany. The firm, Fiegl, based in Bavaria, invested in a new asphalt mixing plant four years ago. More recently, the firm also replaced the plant’s baghouse. The retrofit has since helped lower the plant’s emissions, noise output and fuel consumption. The time frame for the retrofit was tight because it was important to avoid lengthy downtime and production outages in mid-season. This meant that the changeover had to
  • Lintec asphalt plants for Egypt and the Philippines
    December 1, 2023

    Egyptian firm Rsquared Construction has been using a Lintec CSD2500B asphalt plant to assist with material supply for a road project in the south of the country. The Lintec CSD2500B plant’s first task was to supply material for a short but important road link. The firm, Rsquared Construction, selected the model for its ease of transport and low fuel consumption.

  • Wirtgen KMA 220 passes with flying colours at Cologne/Bonn Airport
    July 25, 2018
    A Wirtgen KMA 220 produces hydraulically bound base using a mix-in-plant process for recycling at Cologne/Bonn Airport. With the mobile KMA 220 mobile cold recycling mixing plant from Wirtgen, road construction materials can be recycled or upgraded in just about any location. This avoids countless transport trips and is also sustainable and environmentally friendly. Finally, it is extremely economical, according to Wirtgen. This became clear from a job at Cologne/Bonn airport at the end of 2017. The plan
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba