Skip to main content

Amey trials gully sensors in UK to help prevent road flooding

Engineering and public services provider Amey is installing state-of-the-art sensors into gullies on UK highways in a trial aimed at preventing the flooding of roads.
November 25, 2016 Read time: 2 mins

Engineering and public services provider Amey is installing state-of-the-art sensors into gullies on UK highways in a trial aimed at preventing the flooding of roads.

Excessive rainfall can lead to highways becoming flooded, especially if drains are blocked with silt and waste, increasing road surface damage.

Most local councils and road authorities inspect gullies - drainage pits covered by an open metal grating often located on the road edge - on a cyclical or risk-based basis. Efforts might be focused on gullies that are prone to flooding. However, there has not been a method that allows councils and their contractors to understand in real time when a gully is getting blocked.

In the southern English county of Hampshire, Amey is installing what they describe as “live sensors” into gullies. The sensors measure the level of silt and water inside the drainage pit, feeding this information instantly back to a control centre managed by Amey via web-based, mapped, visualisation software.

This software couples weather forecasting with silt levels to advise administration the possibility of a gully flooding over the following days. Workers can then clean the gully in question, thereby avoiding the need for subsequent emergency – and expensive - attendances.

Amey director Paul Anderson said the technology allows for proactive rather than reactive maintenance. “We have installed 25 sensors in known high-risk gullies and are currently collecting information at these sites. If these sensors works as well as we hope they will, then it could lead to a radically different approach in Hampshire and elsewhere.”

Rob Humby, a member of the council’s environment and transport group, said the sensors should help establish an inventory of each gully which will show when and where maintenance resources are best directed.

Related Content

  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • UK universities' research shows potholes can be fixed better
    February 14, 2013
    Academic research by two UK universities shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. An initial study - undertaken by Nottingham Trent University and the University of Nottingham in central England– found that the application of a coat of bitumen emulsion between two layers of asphalt in a clean, dry repair, greatly improved its resistance to further cracks. It was also confirmed that a hot mix repair – in which asphalt is heated to 140°C
  • ACO’s Qmax Neo drainage for Costa Rica
    June 16, 2021
    Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
  • Winter on the Vaisala Wx Horizon
    November 10, 2022
    Vaisala’s latest Wx Horizon Premium, a weather hazard impact portal, delivers insights into current and future road conditions.