Skip to main content

Versatile materials recycling with Wirtgen

Wirtgen is now offering a versatile solution for materials in the shape of its latest KMA 240(i) model. This replaces earlier versions of the KMA, providing increased performance and capabilities
May 18, 2021 Read time: 3 mins
Wirtgen’s upgraded KMA materials recycling machine offers additional capabilities

The KMA 240(i) is a mobile, cold recycling mixing plant that is capable of processing 240tonnes of material from a variety of construction materials/hour. Using this latest version of the KMA, users can recycle construction materials into road construction in the form of high-quality mix. The unit also delivers a quality product and the firm claims that roads built using its output offer high bearing capacity, resistance to deformation, and long service life.

The KMA 240(i) cold recycling mixing plant produces mix/cold mix that can be paved immediately and is suited to producing different types of bound base layers. In addition to cement-treated base layers (CTB) and roller-compacted concrete (RCC), the machine can also be used to produce bituminous bound base layers (with emulsion or foamed bitumen). The different mixes/cold mixes can be used for a wide range of applications, including highway construction, road and path construction, and the construction of parking lots or industrial areas.

The cold recycling mixing plant is mounted on a flatbed semitrailer and has its own engine unit. This mobile design allows the system to be moved to different locations and set up rapidly. In its new model, Wirtgen has combined the advantages of the earlier KMA 220(i) with improved mixing performance and an innovative cement metering system with automatic self-calibration using static weighing.

Power comes from an economical, low emissions, six-cylinder diesel located inside a noise-insulated housing. The machine can produce a full 20tonne truckload of mix every five minutes. As a result, sections of a cement-treated or bituminous bound base layer with a working width of 4m and a paving thickness of 150mm can be completed over a length of 1400m/day.

The KMA 240(i) can process a large variety of non-cohesive base materials, which wheeled loaders feed to the hopper via vibrating grids. It can produce mixes/cold mixes from a wide variety of new granular mixtures or various milled materials and binding agents. Asphalt milled material, all other non-cohesive materials reclaimed from old road surfaces, and materials from RC processing can all be used to build new road surfaces. The ability to reuse the material results in high CO2 and energy savings with minimal construction costs and project periods.

Silos or tank trucks supply the cold recycling mixing plant with binding agents, such as hot bitumen, bitumen emulsion, and cement. The metering of the input materials and binding agents, the ratio of which is determined in advance by preliminary tests in the road construction laboratory, is monitored by a proven microprocessor control system. The KMA 240(i) can load the new, homogeneous mix directly onto trucks or deposit it continuously on a stockpile. Loading or depositing can be carried out by the discharge conveyor that can swing 55° to either side.

The KMA mobile cold recycling mixing plant can be located in the immediate vicinity of the site, saving time and truck capacity and making it possible to achieve up to 70% fewer CO2 emissions through cold processing, a 90% reduction in transport volumes, and up to 40% lower construction costs, while high-quality building materials can be reused entirely.

For more information on companies in this article

Related Content

  • Asphalt plant innovations from key firms
    June 12, 2017
    Asphalt plant builders continue to develop new technologies to meet different demands from clients. Marini says that in addition to developing new and more sophisticated asphalt plants, the firm is also meeting demands from customers looking to upgrade existing asphalt plants with the addition of new systems. These can be used to boost output and material quality, while also delivering new grades of mixes. At the same time, plant upgrades can reduce the environmental profile of a plant, while improving its
  • Asphalt plant producers see major worldwide successes
    November 21, 2014
    Asphalt plant manufacturers report major supply deals for highway and construction projects - Pat Smith writes International asphalt plant manufacturers have been reporting major successes with their products, which are now working on highway and airport projects worldwide.
  • Rapid action by Rapid International for Scotland’s Collier Group
    April 12, 2018
    Batching plant supplier Rapid International has supplied the Scottish Collier Group with its first batching plant as it enters the ready-mix and precast concrete market. The plant was installed at Collier’s Goathill Quarry in Fife. Collier Group’s activities have included processing of inert rubble, muck and soil from building sites, transportation of ash from power stations, production of type 1 sub-base, rock armour, single size aggregates including high PSV and manufactured concrete sand from the washi
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.