Skip to main content

Mobile recycling options

Wirtgen is broadening its recycling equipment line-up with its latest KMA220 RAP plant. This mobile machine has been designed to meet a need from contractors for a versatile plant that can be set up quickly when needed. The machine offers a mixing capacity of up to 220 tonnes/hour for the production of high-quality cold mixes for use on major highways carrying heavy traffic volumes from recycled material. The KMA220 replaces the earlier KMA200 model and offers a 10% increase in throughput. Power comes from
July 23, 2012 Read time: 2 mins
The Wirtgen KMA220 plant can be moved quickly from site to site and produces cold mix from an array of material types
2395 Wirtgen is broadening its recycling equipment line-up with its latest KMA220 RAP plant. This mobile machine has been designed to meet a need from contractors for a versatile plant that can be set up quickly when needed. The machine offers a mixing capacity of up to 220 tonnes/hour for the production of high-quality cold mixes for use on major highways carrying heavy traffic volumes from recycled material.

The KMA220 replaces the earlier KMA200 model and offers a 10% increase in throughput. Power comes from an onboard, six cylinder diesel rated at 131kW that meets the latest regulations on noise and exhaust emissions. The machine is equipped with a twin-shaft continuous mixer with wear-resistant mixing arms and adjustable blades made from a hard-wearing cast iron. The KMA220 delivers cold mix in batch mode or in continuous mode, with the material being directly loaded into trucks or stockpiled using the plant's slewing discharge conveyor. Mixes produced with foamed bitumen can be stored over extended periods of time.

The KMA220 is 13.4m long (14.71m including the cabin), 2.5m wide and 4m high, and weighs 30.5tonnes. The plant is mounted on a low-bed trailer and the only site set-up required is to swing in the cement auger, discharge conveyor and operator's cabin, while telescoping front support legs are folded out manually.

The plant can use a range of binding agents, while quality cold mixes are produced from a large variety of aggregate mixtures. The KMA220 offers a range of options for binding agents and can use cement, bitumen emulsion or even foamed bitumen. Adding water in addition to these, the mobile plant can be used to process source material into a cold mix suitable for use as a bound base layer. Further mixing options include the use of cement and bitumen emulsion, or cement and foamed bitumen.

For more information on companies in this article

Related Content

  • Road milling advances from key players
    January 30, 2020
    Major manufacturers have introduced key innovations in milling, recycling and stabilisation
  • Recycling asphalt provides green result
    September 30, 2013
    A survey carried out jointly by the National Asphalt Paving Association (NAPA) and the Federal Highway Association (FHWA) shows that asphalt recycling and energy-saving technologies are in increasing use in the US The increasing adoption of new construction practices in the asphalt pavement industry has saved more than US$2.2 billion during the 2011 paving season through the use of recycled materials and energy-saving warm-mix technologies. According to a survey conducted by the National Asphalt Pavem
  • New low emission, versatile asphalt plant from Marini
    February 11, 2013
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at