Skip to main content

Wirtgen scores a first in road recycling

Ireland is now using road recycling techniques in County Cork, with a Wirtgen WR2400 playing an important role. The 3.5km trial is pointing the way for future road rehabilitation projects in the country and is being carried out on a stretch of the busy N71, which links Cork with the peninsula in the south west of Ireland. This three-lane carriageway provides an important link as it is popular with tourists and the trial is being carried out between the towns of Inishannon and Bandon. The 3.5km trial has bee
July 17, 2012 Read time: 2 mins
Ireland is now using road recycling techniques in County Cork, with a 2395 Wirtgen WR2400 playing an important role. The 3.5km trial is pointing the way for future road rehabilitation projects in the country and is being carried out on a stretch of the busy N71, which links Cork with the peninsula in the south west of Ireland. This three-lane carriageway provides an important link as it is popular with tourists and the trial is being carried out between the towns of Inishannon and Bandon. The 3.5km trial has been commissioned by the 5525 National Roads Authority and is employing a Wirtgen WR2400 self-propelled soil stabiliser/recycler owned and operated by Staplestown Ground Stabilisation of Murrintown, County Wexford.

However, the N71 trial looks set to lead to increased use of road recycling techniques, cutting costs and reducing the quantities of new materials required. Staplestown reclaimed and recycled the material from the existing pavement and, in places, changed the camber of the new road at the same time. For this, the carriageway was prepared in advance of the WR2400 using a 1194 Vögele 1803-2 paver, operated by Arkil, of County Kildare and also supplied by Wirtgen Ireland. The paver was used to lay a granular material on top of the existing pavement to correct the road camber and aid drainage. The process involved reworking the existing bituminous surface and granular base to a depth of around 300mm. The WR2400 recycler machine pulverised the material to the required depth, mixed and re-laid the materials in a single pass.

On some sections of the road a patented polymer additive was also mixed with the cement to improve flexural strength, while water was added where necessary. When the additives were mixed, compaction of the layer was carried out conventionally using a 228 Hamm 3520 single drum machine. The recycled stabilised layer was then surfaced with a bituminous base and wearing course. In total, some 28,000m² of road surface was recycled on the N71 trial, representing some 8,400m³ of material.

For more information on companies in this article

Related Content

  • Wirtgen releases new Vögele paver and Hamm compactor
    November 26, 2014
    The Wirtgen Group is now offering variants of its latest Vögele asphalt pavers and Hamm asphalt compactors. The new Vögele Super 2100-3 and Super 1900-3 pavers and Hamm HD12VO and HD10VO compactors are all now built in the firm’s Chinese plant. The pavers feature a lengthened design with a bigger hopper, to allow greater material capacity and are special variants for this major market. The 2.42m long hopper in the Super 2100-3L has been extended by 320mm over the recently launched model sold into other mark
  • Wirtgen releases new Vögele paver and Hamm compactor
    January 6, 2017
    The Wirtgen Group is now offering variants of its latest Vögele asphalt pavers and Hamm asphalt compactors. The new Vögele Super 2100-3 and Super 1900-3 pavers and Hamm HD12VO and HD10VO compactors are all now built in the firm’s Chinese plant. The pavers feature a lengthened design with a bigger hopper, to allow greater material capacity and are special variants for this major market. The 2.42m long hopper in the Super 2100-3L has been extended by 320mm over the recently launched model sold into other mark
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Mexico’s new Jala-Puerto Vallarta Highway
    August 29, 2017
    Mexico’s highway infrastructure plays a key role in the country’s economy, carrying around 55% of its freight and 98% of its passenger traffic. To meet this demand, the network has 377,660km of roads in all. This is split between the 49,652km federal highway network, the 83,982km of state roads, 169.429km of rural roads and 74,596km of access roads. mHowever, although the federal road network manages to connect a large part of the country's strategic points, some stretches already present problems with satu