Skip to main content

Wirtgen scores a first in road recycling

Ireland is now using road recycling techniques in County Cork, with a Wirtgen WR2400 playing an important role. The 3.5km trial is pointing the way for future road rehabilitation projects in the country and is being carried out on a stretch of the busy N71, which links Cork with the peninsula in the south west of Ireland. This three-lane carriageway provides an important link as it is popular with tourists and the trial is being carried out between the towns of Inishannon and Bandon. The 3.5km trial has bee
July 17, 2012 Read time: 2 mins
Ireland is now using road recycling techniques in County Cork, with a 2395 Wirtgen WR2400 playing an important role. The 3.5km trial is pointing the way for future road rehabilitation projects in the country and is being carried out on a stretch of the busy N71, which links Cork with the peninsula in the south west of Ireland. This three-lane carriageway provides an important link as it is popular with tourists and the trial is being carried out between the towns of Inishannon and Bandon. The 3.5km trial has been commissioned by the 5525 National Roads Authority and is employing a Wirtgen WR2400 self-propelled soil stabiliser/recycler owned and operated by Staplestown Ground Stabilisation of Murrintown, County Wexford.

However, the N71 trial looks set to lead to increased use of road recycling techniques, cutting costs and reducing the quantities of new materials required. Staplestown reclaimed and recycled the material from the existing pavement and, in places, changed the camber of the new road at the same time. For this, the carriageway was prepared in advance of the WR2400 using a 1194 Vögele 1803-2 paver, operated by Arkil, of County Kildare and also supplied by Wirtgen Ireland. The paver was used to lay a granular material on top of the existing pavement to correct the road camber and aid drainage. The process involved reworking the existing bituminous surface and granular base to a depth of around 300mm. The WR2400 recycler machine pulverised the material to the required depth, mixed and re-laid the materials in a single pass.

On some sections of the road a patented polymer additive was also mixed with the cement to improve flexural strength, while water was added where necessary. When the additives were mixed, compaction of the layer was carried out conventionally using a 228 Hamm 3520 single drum machine. The recycled stabilised layer was then surfaced with a bituminous base and wearing course. In total, some 28,000m² of road surface was recycled on the N71 trial, representing some 8,400m³ of material.

For more information on companies in this article

Related Content

  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.
  • From Bangalore to Dumfries, plastic waste technology is reinforcing our roads
    May 2, 2018
    At last some good news about plastic waste: road authorities around the world are starting to use it in their roads - Kristina Smith reports.
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.