Skip to main content

Test track milling with Roadtec

A milling machine from Roadtec has carried out important work at the National Centre for Asphalt Technology (NCAT) test track in the US. The 2.7km NCAT test track is used for asphalt pavement testing and research. As the facility is important to the advancement of asphalt technologies, Roadtec donates its time, equipment and personnel to carrying out rehabilitation work at the test track. An RX900E model was donated by Roadtec to NCAT and was used by David Bussard and Charlie Butler to mill to depths from
September 11, 2018 Read time: 1 min

A milling machine from 1252 Roadtec has carried out important work at the National Centre for Asphalt Technology (NCAT) test track in the US. The 2.7km NCAT test track is used for asphalt pavement testing and research. As the facility is important to the advancement of asphalt technologies, Roadtec donates its time, equipment and personnel to carrying out rehabilitation work at the test track. An RX900E model was donated by Roadtec to NCAT and was used by David Bussard and Charlie Butler to mill to depths from 28.6mm to 1.07m. The machine had to mill the 8.5m-wide track in a number of passes and was fitted with a 2.2m- wide drum, featuring teeth on a 16mm spacing.

For more information on companies in this article

Related Content

  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.
  • Caterpillar's milling and loading advances
    February 15, 2012
    Caterpillar is broadening the range of applications for its PM200 milling machines as well as offering a new tracked loader model. The PM200 milling machine can now be fitted with a 2.2m wide milling drum for special wide cutting applications.
  • New developments in road recycling and milling
    June 11, 2019
    New developments in road recycling and milling will allow contractors to remove old surfaces more quickly and efficiently – Mike Woof reports
  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start