Skip to main content

Recycling option

Roadtec is offering a new cold recycling machine, the RT-500, aimed at duties in projects using the recycling train concept. Electrically powered by a Cat C9 generator set, the RT-500 can handle up to 600 tonnes/hour of material and is designed to crush and screen the recycled asphalt pavement (RAP) produced by an RX-900 cold planer. It has a JCI double deck screen that sorts milled material provided by the RX-900's conveyor. Any oversized material is fed back into the RT-500's Telsmith 3048 impact crusher
February 22, 2012 Read time: 2 mins
1252 Roadtec is offering a new cold recycling machine, the RT-500, aimed at duties in projects using the recycling train concept.

Electrically powered by a 2294 CAT C9 generator set, the RT-500 can handle up to 600 tonnes/hour of material and is designed to crush and screen the recycled asphalt pavement (RAP) produced by an RX-900 cold planer. It has a JCI double deck screen that sorts milled material provided by the RX-900's conveyor. Any oversized material is fed back into the RT-500's 2987 Telsmith 3048 impact crusher and back to the screen via a two-conveyor return circuit. The conveyors have cleated belts for maximum production while a water spray system prevents dust build up on rollers and the conveyors are covered for safety and to prevent roll-off.

Material that passes the screen drops onto a 1.22m wide weigh belt with an accurate electronic scale that communicates with the blending computer and adjusts the flow of additives going into the RT-500's JCI/KPI Model 52 pugmill twin shaft mixer with a capacity of 600tonnes/hour. After mixing the material is discharged in a windrow onto the roadway.

The Roadtec RX-900 cold planer provides the propulsion for the recycling train and tows the RT-500 cold recycler and a nurse tank for the emulsions, as well as a water truck and a slurry tanker. The RX-900 also pushes another emulsion tanker and slurry tank when they are present to refill tankers hooked to the train. Those two replenishing tankers are attached to the train long enough to pump off their products and then go to a staging area where they are refilled to return to the train.

A windrow loader also follows the train to pick up material and feed it to a conventional paver.

For more information on companies in this article

Related Content

  • Keestrack crushing in all performance levels
    March 2, 2016
    With transport weights of less than 30tonnes are the jaw crusher Keestrack B2 (former Argo), with a jaw width of 1,000mm, and the crusher unit Keestrack R4 (former Destroyer 1011) with add-on screener and oversize material recycler. This also applies to the Keestrack R8 top crusher unit (former Destroyer 1313), that is presented as a highly productive mobile solution in the output range of 450tonnes/hour. “As is the case for all Keestrack crusher units, the heavy construction of the 1,250mm wide roto
  • Keestrack crushing in all performance levels
    January 6, 2017
    With transport weights of less than 30tonnes are the jaw crusher Keestrack B2 (former Argo), with a jaw width of 1,000mm, and the crusher unit Keestrack R4 (former Destroyer 1011) with add-on screener and oversize material recycler. This also applies to the Keestrack R8 top crusher unit (former Destroyer 1313), that is presented as a highly productive mobile solution in the output range of 450tonnes/hour. “As is the case for all Keestrack crusher units, the heavy construction of the 1,250mm wide roto
  • Increased milling productivity
    February 6, 2012
    Using a wider milling drum on certain applications has allowed an Italian contractor to boost productivity.
  • It’s in with the new for asphalt plants
    April 4, 2013
    A leading asphalt plant manufacturer is playing a key role in the upgrade of a major European airport, while another is said to have created one of the most modern plants in Europe. Meanwhile, a host of new plants and plant concepts have been, or are about to be, unveiled. Guy Woodford reports Intrame says its ultra-mobile UM-280 asphalt plant has played a key role in the resurfacing of the runway and taxiways at Gatwick Airport in southern England – the busiest single runway airport in the world. Around 35