Skip to main content

Recycled road innovation in France

Eurovia has completed part of major French highway renovation project using 100% recycled asphalt.
February 27, 2019 Read time: 2 mins
Marini-Ermont and Eurovia worked together to develop the TRX100 mobile continuous plant, able to utilise up to 100% RAP in its feed

Eurovia has completed part of major French highway renovation project using 100% recycled asphalt. Eurovia, a subsidiary of transport infrastructure firm 5177 VINCI, claims that this is the first time anywhere that a road has been rebuilt using only recycled materials.

Eurovia carried out the work in collaboration with VINCI Autoroutes. The road was rebuilt as part of a major highway renovation project on the VINCI Autoroutes network, along a 1km stretch of the A10 route between Pons and Saint Aubin in south-west France. Eurovia successfully completed this pilot experiment after more than two years of research and development.

The fully recycled road was made possible through the development, in partnership with Marini-Ermont (part of the Fayat Group), of the innovative TRX100 mobile continuous asphalt plant. This plant made it possible to recycle up to 100% of asphalt aggregates from nearby road maintenance sites.

The bulk of the supply could be sourced from the milling of materials produced by the site, minimising the need for fresh material and reducing transport logistics and the site’s carbon footprint, This approach is said to have helped deliver a 50% reduction in greenhouse gas emissions.

VINCI Autoroutes is a leading highway operator in France and the firm says it is keen to further utilise road recycling solutions across its projects. This research project won the ‘Route du futur’ call for projects launched by the French Environment & Energy Management Agency, ADEME.

For more information on companies in this article

Related Content

  • Cameroon highway connection being upgraded
    July 25, 2014
    Construction company Sogea-Satom will carry out the US$101 million contract to upgrade Cameroon’s West Doula highway. The firm is a subsidiary of French contractor Vinci. The work is for a 13km stretch of Cameroon’s RN3 National Road and will take 30 months to complete. The work is being financed by the French development agency (AFD). Sogea-Satom previously won a contract to build a bridge on the RN3 route.
  • European regulations for engine emissions are getting tougher
    January 4, 2013
    Emissions remain the focus for engine development but equipment manufacturers want clarity from regulators. Emissions remain a major challenge for the off-highway construction equipment market. The EU has tough targets in this respect and its objective is an overall reduction of CO2 emissions of 80-95% by the year 2050, compared to 1990 levels. There is considerable research already underway on how to reduce fuel consumption and to help ensure the security of energy supply. A number of industry sectors, suc
  • Road recycling
    September 27, 2023
    Easier to operate, thanks to the increasing use of GPS, and greener to run because of biofuels are two of the more innovative technologies being integrated into machine design by major road recycling equipment manufacturers.
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba