In Australia local authorities are facing increasing pressure to keep roads properly maintained while cutting costs at the same time. This presents a major problem, however two local authorities have begun using a novel solution to road maintenance and repairs, based around using the latest version of Caterpillar's RM300 rotary mixer.
April 16, 2012 Read time: 3 mins
In Australia local authorities are facing increasing pressure to keep roads properly maintained while cutting costs at the same time. This presents a major problem, however two local authorities have begun using a novel solution to road maintenance and repairs, based around using the latest version of 178 Caterpillar's RM300 rotary mixer. 2827 Longreach Regional Council in Longreach, Queensland, and 2828 Murray Shire Council at Mathoura in New South Wales are both boosting production and lowering costs following the delivery of the RM300s. Long reach has plenty of experience with the reclaimer concept, having bought an earlier Caterpillar RR250B in 1998. This new RM300 offers considerable gains in performance however and was put to work soon after delivery on a road project 10km south of Longreach and was used to repair a section of road 20km in length and 5m wide.

The work required on-site mixing of the existing road base with cement to a depth of 250mm, which was then sealed. All the necessary materials were trucked in side tippers, shaped using a grader and then mixed by the reclaimer. The job was carried out in a single pass by the reclaimer and the new machine's additional power and weight over the earlier model was noted as this made pushing the supply tankers around curves somewhat easier. Compaction was then carried out using a machine with a padfoot drum first, followed by smooth drum rollers. Around eight passes were required, with the machines set on high amplitude for the first two-three and then set to low amplitude for subsequent compaction. The production rates varied depending on factors such as materials supply and the conditions of the specific location but using the RM300, the team was able to compact some 1.7km/day to a depth of 200mm. Using the reclaimer with compactors has provided major cost savings with regard to purchasing and transporting new aggregates (as well as water). According to Longreach Regional Council, the reclamation process costs around 70% of conventional road construction techniques and allows a road life of around 10 years.

Meanwhile Murray Shire is using its RM300 in a variety of applications, including rural roads, country roads and urban work. According to the customer, some jobs last days or weeks, while it is not unusual for the machine to be used at three different locations in a single working week. The jobs include working on unsealed roads for combining sand and clay; combining crushed rock and gravel; ripping up sealed roads ready for a complete rehabilitation project. The machine is also used in urban streets and run alongside kerbs and gutters, where its quiet operation has been beneficial.

For more information on companies in this article

Related Content

  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Protecting new asphalt overlay
    October 20, 2017
    Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani. For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to hand
  • Bio-binder and reclaimed asphalt trials for UK
    August 15, 2024
    Heidelberg Materials has used its CarbonLock asphalt containing polymer modified bitumen bio-binders, produced as both hot mix and warm mix asphalts.
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.