Skip to main content

Indonesia’s improved airport benefits from new runway

A new runway surface has been constructed at Yogyakarta International Airport in Indonesia.
September 19, 2019 Read time: 1 min
Slipforming machines from Wirtgen have been used to pave the runway, taxiways and aircraft parking facilities at Indonesia’s Yogyakarta International Airport

This airport has been developed to replace Adisutjipto International Airport of Yogyakarta, which is no longer able to meet capacity demands. The runway has been in use since the beginning of May 2019, when the first aircraft landed on the new runway.

Construction of this new airport is being carried out in two phases and the facility will cover a site of 645ha and be able to handle up to 15 million passengers/year when it is fully commissioned.

Concrete paving equipment from 2395 Wirtgen has been used to pave the main runway, the taxiways and aircraft parking areas. In all, 11 slipform pavers from Wirtgen have been used at the airport. The completed runway measures 3.25km in length and is 45m wide.

 

For more information on companies in this article

Related Content

  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar