Skip to main content

Indonesia’s improved airport benefits from new runway

A new runway surface has been constructed at Yogyakarta International Airport in Indonesia.
September 19, 2019 Read time: 1 min
Slipforming machines from Wirtgen have been used to pave the runway, taxiways and aircraft parking facilities at Indonesia’s Yogyakarta International Airport

This airport has been developed to replace Adisutjipto International Airport of Yogyakarta, which is no longer able to meet capacity demands. The runway has been in use since the beginning of May 2019, when the first aircraft landed on the new runway.

Construction of this new airport is being carried out in two phases and the facility will cover a site of 645ha and be able to handle up to 15 million passengers/year when it is fully commissioned.

Concrete paving equipment from 2395 Wirtgen has been used to pave the main runway, the taxiways and aircraft parking areas. In all, 11 slipform pavers from Wirtgen have been used at the airport. The completed runway measures 3.25km in length and is 45m wide.

 

For more information on companies in this article

Related Content

  • Improved runways for Jeddah International Airport
    August 21, 2013
    With an increasing number of aircraft using Jeddah International Airport in Saudi Arabia, the authorities realised there was a need to upgrade the facilities. King Abdulaziz International Airport opened in 1982 and serves over 15 million passengers/year, with a high percentage travelling on the annual Islamic pilgrimage to Mecca, some 80km away. The city has the largest port on the Red Sea and is named after Abd al-Aziz ibn Saud, the former king and founding father of Saudi Arabia, and is one of the kin
  • New runway for Philippines airport
    October 1, 2018
    SunWest Construction Development Corporation has been using a concrete paver from Power Pavers at the new Bicol International Airport in the Philippines. The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible. SunWest used its Powe
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N